A Study on the Introduction of the Work Breakdown Structure for Infrastructure Asset Management

  • Jeong, Seongyun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.691-692
    • /
    • 2015
  • Several scholars in South Korea have predicted that maintenance costs of social infrastructure will sharply increase from the mid-2020s, and cause budgetary deficits among facilities management agencies. Interest in infrastructure asset management (IAM) is rising as a solution to such problem. In this study, an information system for asset valuation that reflects the salvage value and deferred cost of social infrastructure based on WBS (work breakdown structure) was developed in consideration of IAM. To reuse the construction cost information such as the acquisition cost, the interconnection between CBS (cost breakdown structure) and WBS was considered. Furthermore, asset valuation information was developed with XML schema to facilitate the exchange and reuse of the information among project participants.

  • PDF

표준화된 PSDM을 사용한 최적의 WBS 및 효과적인 중소기업 정보화 시스템 구축에 관한 연구 (A study on Deployment of the Optimized WBS and Effective Small and Medium Enterprise Informatization System using Standardized PSDM)

  • 윤경배;권희철
    • 한국인터넷방송통신학회논문지
    • /
    • 제14권6호
    • /
    • pp.199-205
    • /
    • 2014
  • 효과적인 중소기업 정보화를 위하여 표준화된 생산정보화 시스템 개발 방법론(PSDM)을 통하여 단계별 주요 업무에 대한 작업을 정의하고 관련 연관도를 통하여 업무에 대한 선행 및 후행 관계를 정의한 후 그에 따른 프로젝트 범위 일정 비용 인적자원 관리를 위한 최적의 업무분류체계(WBS : Work Breakdown Structure)를 연구개발 하고자한다. 시스템의 신뢰성 품질 생산성 향상을 위한 관리 항목 설정, 중소기업 IT업체 감리업체 등 참여 기업간의 의사소통, 그리고 구축된 생산정보화의 유지보수를 포함한 운영지원 등 보다 체계적이고 효율적인 시스템 구축을 위해 중소기업 생산정보화에 적합한 WBS의 연구로 생산정보화를 구축하고자 참여하는 많은 중소기업 및 IT업체들이 표준화된 방법론을 이용하여 시스템 구축을 보다 효과적으로 수행할 수 있으며, 보다 높은 신뢰성을 가진 시스템을 계획된 개발 일정에 알맞게 구축한다.

세일요트 통합관리 시스템을 위한 웹기반 YWBS 설계 프로그램 (Development of a Web-Based Application for YWBS in Integrated Management Systems)

  • 이동건;남승훈;정용국;신종계
    • 대한산업공학회지
    • /
    • 제39권1호
    • /
    • pp.46-54
    • /
    • 2013
  • Recently, the marine leisure industry has begun to make a mark on the growth engines of the Korean economy. Hence, various government research projects are in progress to catch up with the fundamental yacht technologies of advanced countries. Research on the integrated management technologies of sail yachts is carried out as a part of those projects. Work Breakdown Structure (WBS) is a basic architecture for robust and high-level management systems. In this paper, we suggest a product-oriented Yacht Work Breakdown Structure (YWBS). General WBS has a drawback in that it can only follow the targeted purpose, but YWBS allows for a generic WBS approach. This concept allows us to apply WBS to multi-purpose uses. The YWBS is used as an infrastructure in information management and for data relationships in sail yacht management systems. YWBS is designed and managed by a web application, and the system is implemented with a website as a user interface. This application has not only a design function, but also a data transfer function that is based on the Microsoft Silverlight platform, a kind of Rich Internet Application (RIA) technology. Using this application, YWBS designers can communicate with the management system without added tasks like as uploading and updating.

공동주택 건축공사의 효율적인 PMIS 운용을 위한 통합WBS 개발 (Development of Integrated Work Breakdown Structure for Project Management Information System in Multi-Family House Projects)

  • 박지현;신주용;김해곤;홍태훈;구교진;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.801-804
    • /
    • 2007
  • 최근 건설 프로젝트가 대형화, 복잡화됨에 따라 건설 프로젝트 관리에 있어 정보관리 시스템의 역할이 커지고 있다. 이에 따라 PMIS의 개발이 가속화되고 있다. PMIS를 효율적으로 운용하는데 여러 문제점이 있지만 그 중 가장 시급한 문제는 표준화된 WBS가 없다는 것이다. 본 연구는 공동주택 공사의 건설공사를 중심으로 공공기관과 민간건설업체 4곳의 전문가들에게서 면담을 실시한 후 문제점을 파악 나아가 각 기관별 WBS를 비교, 분석 하였다. 분석결과를 바탕으로 통합WBS 개선안을 제시하였고, 사례연구를 통해 현재 사용되고 있는 PMIS의 활용방안 개선안을 제시하였다.

  • PDF

학교시설물 유지관리를 위한 공사 분류 체계 분석 (Analysis of Construction Work Breakdown Structure of Maintenance of Educational Facility)

  • 류한국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.251-252
    • /
    • 2015
  • Enough school facility maintenance data should be accumulated in a database or data warehouse in order to supply information about school facility correct maintenance budget plan, budget assignment, and cycle and rate of maintenance or replacement. For those, this research analyze the present school facility maintenance practice and budget and construction cost structure. In order to solve the problems, this study analyze the present practice of maintenance and replacement and obtain LCC(Life cycle cost) data, perform expert interview and then establish construction work breakdown structure of maintenance of educational facility by combining work breakdown structure(WBS) and cost breakdown structure(CBS).

  • PDF

시각화 지표 및 좌표식 정보분류체계에 의한 공정.공사비 통합관리시스템 개발 (Development of Earned Value Management System by Using Visualization Index and WBS Map)

  • 이우식;강인석;박서영
    • 한국건설관리학회논문집
    • /
    • 제10권1호
    • /
    • pp.26-35
    • /
    • 2009
  • 건설공사 공정 공사비 통합관리시스템(EVMS, Earned Value Management System)에서 대부분의 정보들은 공사정보 분류체계(WBS, Work Breakdown Structure)를 중심으로 활용된다. 즉, 공정편차와 비용편차 등의 EVM 성과정보 역시 WBS에서 선택된 공종을 중심으로 결과물이 분석되므로, EVMS에서 WBS는 정보중심 역할을 하게 된다. 본 연구에서는 WBS 정보가 4상한의 좌표방식으로 표현되어 프로젝트의 대 중 소 공종이 용이하게 표현될 수 있는 좌표식 공사정보분류체계(WBS Map) 표현기법을 구축하였다. 또한 연구에서는 WBS Map에 근거한 EVMS를 개발하였으며, 개발된 EVMS에서는 각종 속성 지표값들을 색상기호 등으로 시각화하는 방법론을 구축하여 EVMS 정보의 실무 활용성을 높일 수 있도록 하였다.

대규모 정보시스템 개발 프로젝트를 위한 작업분담구조도의 모형화에 관한 연구 (Modeling the WBS for a Large-Scale IS Development Project)

  • 이남용;김태형
    • 한국정보처리학회:학술대회논문집
    • /
    • 한국정보처리학회 2000년도 제13회 춘계학술대회 및 임시총회 학술발표 논문집
    • /
    • pp.821-829
    • /
    • 2000
  • 과거 20여년간 작업분담구조도(WBS)는 대규모의 정보시스템을 개발 및 획득하여 운용하고자 하는 시스템 프로젝트 관리자에게 관심의 초점이 되여 왔다. WBS 는 정보시스템을 개발하고 획득하며 운용하기 위한 관련된 많은 작업을 효과적으로 식별하고 임무를 분담시켜 프로젝트를 성공적으로 수행하기 위한 중요한 수단이다. 즉, 정보시스템 개발 프로젝트를 효과적으로 기획하고 관리/통제하기 위하여 WBS 는 없어서는 않되는 중요한 프로젝트 관리의 메커니즘인 것이다. WBS 는 프로젝트를 조직화하고, 비용을 예측 및 통제하며, 작업을 효과적으로 관리하고, 외주용역 시에는 계약 업체를 관리할 수 있는 편리한 기능을 제공해 준다. 본 논문은 저자의 실질적인 경험에 의거하여 사례로서 개념적인 WBS 를 모형화하며, WBS 개발 시에 중요한 고려사항을 제시하였다. 본 논문에서 제시된 모형과 고려사항은 조직 내에서 요구사항을 만족하는 WBS 를 개발하는데 많은 도움이 되리라고 확신한다.

  • PDF

공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안 (Apartment house project cost schedule for integrated management BIM-based BoQ application plan)

  • 정련의;김웅기;함남혁;김재준
    • 한국BIM학회 논문집
    • /
    • 제11권2호
    • /
    • pp.1-16
    • /
    • 2021
  • Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improve the efficiency of cost management and help achieve the goal of cost management. But through BIM to realize project cost management, there is still no good solution. In order to solve this problem, this paper puts forward the concept of WBS structure applied to construction projects by studying the BoQ (Bill of Quantities) list based on BIM, and proposes the numbering method of the structure. The WBS (Work Breakdown Structure) structure proposed in this paper divides more than 5000 cost objects into 133 projects according to the type of work and project schedule. This structure helps to realize the application of BIM in project cost management. Although this article has studied more than 5000 data of three projects, it does not think that it can cover all cost objects in the existing construction industry. The purpose of this article is to propose a solution for cost and Process Control using BIM-based BoQ data.

공정${\cdot}$공사비 통합관리시스템의 실무적용 효율화 방안 (A Study on the Efficiency of Earned Value Management System for Practical Application)

  • 이우식;강인석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.500-503
    • /
    • 2003
  • 현재, 국내 건설업에서 공정과 공사비 정보를 통합관리할 수 있는 공정${\cdot}$공사비 통합관리시스템(EVMS)의 필요성이 제기되고 있으며, 일정규모 이상의 대형건설공사에 적용될 예정이다. 본 연구에서는 EVNS의 효율성 증진을 위한 공사분류체계(WBS)를 연계하는 방법론을 제안하고 있으며, 또한 실무활용성을 극대화하기 위해 방법론 기초한 웹기반 공정${\cdot}$공사비 통합관리시스템의 시안을 구축하였다.

  • PDF