A study on the excavation cycle by the drill-and-blast method for a room-and-pillar underground structure  

Lee, Chul-Ho (Geotechnical Engineering Research Institute, Korea Institute of Civil Engineering and Building Technology)
Hyun, Young-Hwan (ESCO Consultant & Engineers Co., Ltd)
Hwang, Je-Don (ESCO Consultant & Engineers Co., Ltd)
Choi, Soon-Wook (Geotechnical Engineering Research Institute, Korea Institute of Civil Engineering and Building Technology)
Kang, Tae-Ho (Geotechnical Engineering Research Institute, Korea Institute of Civil Engineering and Building Technology)
Chang, Soo-Ho (Geotechnical Engineering Research Institute, Korea Institute of Civil Engineering and Building Technology)
Publication Information
Journal of Korean Tunnelling and Underground Space Association / v.18, no.6, 2016 , pp. 511-524 More about this Journal
Abstract
Since a room-and-pillar underground structure is characterized by its grid-type array of room and pillar, its economical efficiency can be governed by excavation sequence. In this study, the construction period by the drill-and-blast method as a excavation method for a room-and-pillar underground structure was examined. In addition, the parallel excavation sequence was considered as the main sequence of a room-and-pillar underground structure. Sequences of mucking and support installation were derived to estimate the total excavation cycle by taking the case of a road tunnel into consideration. From the excavation cycle of room-and-pillar underground structure, the relationship between available maximum and minimum numbers of jumbo drill machines depending on the number of faces in operation was suggested.
Keywords
Room-and-pillar method; Drill-and-Blast; Excavation; Sequence; Construction period;
Citations & Related Records
Times Cited By KSCI : 4  (Citation Analysis)
연도 인용수 순위
1 Carmody, J., Sterling, R. (1993), Underground Space Design - A Guide to Subsurface Utilization and Design for People in Underground Spaces, International Thomson Publishing company, p. 110.
2 Chun, J., So, B., Choo, J, Woo, S. (2005), "Simulation based Productivity Analysis for NATM Operations", Journal of the Korean Society of Civil Engineers, Vol. 25, Issue 3D, pp. 457-462 (in Korean).
3 Darling, P. (2011), Mining Engineering handbook, Society for Mining, Metallurgy and Exploration, INC.(SME), 3rd Edition.
4 Esterhuizen, G.S., Dolinar, D.R., Ellenberger, J.L, Prosser, L.J. (2011), Pillar and roof span design guidelines for underground stone mines, Department Of Health And Human Services, NIOSH, IC 9526.
5 Hartman, H.L., Mutmansky, J.M. (2002). Introductory Mining Engineering. 2nd edition, Wiley, New Jersey.
6 Hoek, E., Brown E.T (1980), Underground Excavation in Rock, Institution of Mining and metallurgy.
7 KEC (2000), Construction management for drill-andblasting method in tunnel, Korea Express Corporation (in Korean).
8 Lee, C., Hwang, J., Kim, E., Chang, S.-H. (2014a), "Consideration on design procedure of room-andpillar underground structure, Part I: parametric study", J. of Korean Tunn Undergr Sp Assoc, Vol. 16, No. 5, pp. 487-495 (in Korean).   DOI
9 Lee, C., Hur, J., Hyun, Y., Chang, S.-H. (2014b), "Consideration on design procedure of room-andpillar underground structure, Part II: selection of shape to design supports", J. of Korean Tunn Undergr Sp Assoc, Vol. 16, No. 5, pp. 497-506 (in Korean).   DOI
10 Lee, C., Hyun, Y., Song, J., Chang, S.-H. (2015), "A preliminary study on the excavation sequence of a room-and-pillar underground structure by the drilland- blast mehtod", J. of Korean Tunn Undergr Sp Assoc, Vol. 17, No. 6, pp. 605-614.   DOI
11 MOLIT (Ministry of Land, Infrastructure and Transport Ordinary) (2011), Standard Estimating System of Construction (in Korean).
12 Svanholm, B.O., Persson, P.A., Larsson, B. (1977), "Smooth blasting for reliable underground openings", In Rockstore 77: Storage in excavated rock caverns, proc. 1st Int. Symp., Stockholm, (ed. M. Bergman), pp. 573-579. Oxford: Pergamon.