Browse > Article List

논문
1 A study on the excavation cycle by the drill-and-blast method for a room-and-pillar underground structure
Lee, Chul-Ho;Hyun, Young-Hwan;Hwang, Je-Don;Choi, Soon-Wook;Kang, Tae-Ho;Chang, Soo-Ho; / Korean Tunnelling and Underground Space Association , v.18, no.6, pp.511-524,
2 Developments of performance-based assessment technique for existing tunnels
An, Jai-Wook;Kim, Hong-Kyoon; / Korean Tunnelling and Underground Space Association , v.18, no.6, pp.525-533,
3 Investigation of ground behaviour between plane-strain grouped pile and 2-arch tunnel station excavation
Kong, Suk-Min;Oh, Dong-Wook;Ahn, Ho-Yeon;Lee, Hyun-Gu;Lee, Yong-Joo; / Korean Tunnelling and Underground Space Association , v.18, no.6, pp.535-544,
4 The development of a back analysis program for subsea tunnel stability under operation: longitudinal direction
An, Joon-Sang;Kim, Byung-Chan;Moon, Hyun-Koo;Song, Ki-Il; / Korean Tunnelling and Underground Space Association , v.18, no.6, pp.545-556,
5 A numerical study on squeezing of overstressed rock around deep tunnels
Lee, Kun-Chai;Moon, Hyun-Koo; / Korean Tunnelling and Underground Space Association , v.18, no.6, pp.557-568,
6 A study on the optimization technique for the plan of slope reinforcement arrangement of soil-nailing in tunnel portal area
Kim, Byung-Chan;Moon, Hyun-Koo; / Korean Tunnelling and Underground Space Association , v.18, no.6, pp.569-579,
7 Behavior of double deck tunnel due to feature change and variation of ground water table
Park, No-Hyeon;Kim, Ho-Jong;Shin, Jong-Ho; / Korean Tunnelling and Underground Space Association , v.18, no.6, pp.581-591,