A preliminary study on the optimum excavation sequence of a room-and-pillar underground structure |
Lee, Chulho
(Geotechnical Engineering Research Division, Korea Institute of Civil Engineering and Building Technology)
Choi, Soon-Wook (Geotechnical Engineering Research Division, Korea Institute of Civil Engineering and Building Technology) Hyun, Younghwan (ESCO Consultant & Engineers Co., Ltd.) Hwang, Jedon (ESCO Consultant & Engineers Co., Ltd.) Chang, Soo-Ho (Geotechnical Engineering Research Division, Korea Institute of Civil Engineering and Building Technology) |
1 | Chun, J., So, B., Choo, J, Woo, S. (2005), "Simulation based Productivity Analysis for NATM Operations", Journal of the Korean Society of Civil Engineers, Vol. 25, Issue 3D, pp 457-462 (in Korean) |
2 | Darling, P. (2011), Mining Engineering handbook, Society for Mining, Metallurgy and Exploration, INC.(SME), 3rd Edition. |
3 | Hartman, H.L., Mutmansky, J.M. (2002). Introductory Mining Engineering. 2nd edition, Wiley, New Jersey. |
4 | Lee, C., Hwang, J., Kim, E., Chang, S-H. (2014a), "Consideration on design procedure of room-andpillar underground structure, Part I: parametric study", J. of Korean Tunn Undergr Sp Assoc, Vol. 16, No. 5, pp 487-495 (in Korean). DOI |
5 | Lee, C., Hur, J., Hyun, Y., Chang, S-H. (2014b), "Consideration on design procedure of room-andpillar underground structure, Part II: selection of shape to design supports", J. of Korean Tunn Undergr Sp Assoc, Vol. 16, No. 5, pp 497-506 (in Korean). DOI |
6 | Hoke, E. and Brown E.T (1980), Underground Excavation in Rock, Institution of Mining and metallurgy. |