Browse > Article List

논문
1 A manual for the revised TBM tunnel specification
Sagong, Myung;Jung, Chi Kwang;Moon, Joon Bai;Kim, Jeayoung;Yun, Do Sik;Yu, Myeong Han; / Korean Tunnelling and Underground Space Association , v.17, no.4, pp.415-428,
2 The study on the hydraulic pressure reduction of drainage shield tunnel using model test and field instrumentation
Kim, Dong-Min;Ma, Sang-Joon;Lee, Young-Sub; / Korean Tunnelling and Underground Space Association , v.17, no.4, pp.429-440,
3 Developments of real-time monitoring system to measure displacements on face of tunnel in weak rock
Yun, Hyun-Seok;Song, Gyu-Jin;Kim, Yeong-Bae;Kim, Chang-Yong;Seo, Yong-Seok; / Korean Tunnelling and Underground Space Association , v.17, no.4, pp.441-455,
4 Refurbishment of a 3.6 m earth-pressure balanced shield TBM with a domestic cutterhead and its field verification
Bae, Gyu-Jin;Chang, Soo-Ho;Choi, Soon-Wook;Kang, Tae Ho;Kwon, Jun-Yong;Shin, Min-Sik; / Korean Tunnelling and Underground Space Association , v.17, no.4, pp.457-471,
5 Analysis of inner parts in the disc cutters applied to the field tests
Bae, Gyu-Jin;Choi, Soon-Wook;Chang, Soo-Ho;Lee, Gyu-Phil;Song, Bong-Chan;Kim, Kab-Boo; / Korean Tunnelling and Underground Space Association , v.17, no.4, pp.473-485,
6 A study on the social cost estimation of the tunnel section enlargement method considering traffic flow
Lee, Seung Soo;Kim, Dong-Gyou;Seo, Jong Won; / Korean Tunnelling and Underground Space Association , v.17, no.4, pp.487-497,
7 A preliminary study on the optimum excavation sequence of a room-and-pillar underground structure
Lee, Chulho;Choi, Soon-Wook;Hyun, Younghwan;Hwang, Jedon;Chang, Soo-Ho; / Korean Tunnelling and Underground Space Association , v.17, no.4, pp.499-511,