1 |
Benchmarking Study of the Cycle Scheduling Analysis Methods in FMS
/
[
J.K.LEE
] /
In : proceeding IEEE SMC'02
|
2 |
J. K. Lee, Benchmarking Study of the Cycle Scheduling Analysis Methods in FMS, In : proceeding IEEE SMC'02, 2002
|
3 |
C. Valentin, Modeling and Analysis methods for a class of Hybrid Dynamic Systems, In : proceeding Symposium ADPM'94, pp. 221-226
|
4 |
H. Ohl, H. Camus, E. Castelain, and J-C. Gentina, 'Petri nets Modeling of Ratio-driven FMS and Implication on the WIP for Cyclic Schedules', In:Proceedinf SMC'95, pp. 3081-3086, 1995
DOI
|
5 |
H. Camus, Conduite de systemes Flexibles de Production Manu- facturiere par composition de regimes permanents cycliques : modelisation et evaluation de performances a l'aide des Reseaux de Petri, These de doctorat USTL 1, mars 1997
|
6 |
J. K. Lee, O. Korbaa, and J. C. Gentina, 'Modeling and analysis of Cycle scheduling using Petri nets unfolding', In : proceeding IEEE SMC'01, pp. 2611-2616, 2001
DOI
|
7 |
J. K. Lee, Une methode d'ordinnancement des systems flexibles de production manufacturiere utilisant le depliage des reseaux de Petri, These de doctorat EC Paris, mars 2002
|
8 |
O. Korbaa, H. Camus and J-C. Gentina, 'FMS cyclc Scheduling with Overlapping production cycles', In: proceedings ICATPN'97, pp. 35-52, 1997
|
9 |
O. Korbaa, Commande cyclique des systems flexibles de productiom manufacturiere a l'aide des reseaux de Petri: de la planification a l'ordonnancement des regimes transoires, These de doctorat USTL 1, juillet 1998
|
10 |
P. Richard, 'Scheduling timed marked graphs with resources a serial method', In : proceeding INCOM'98, 1998
|
11 |
W. Zuberek and W. Kubiah, 'Throughput Analysis of Manufacturing Cells Using Timed Petri nets', In : Proceeding ICSYMC 1993, pp. 1328-1333, 1993
DOI
|
12 |
J. Carlier, P. Chretienne and C. Girault, Modeling Scheduling Problems with Timed Petri Nets, in Advanced in Petri Nets 1984, Lecture Notes in Computer Science, G. Goes and J. Hartmanis(eds), Springer-Verlag Pub.Co., pp. 62-82, 1985
|
13 |
H. Hillion, J-M Proth, and X-L Xie, A Heuristic Algorithm for Scheduling and Sequence Job-Shop problem, In : proceeding 26th CDC, pp. 612-617, 1987
|