|
1 |
Improvement of Construction Management System in Public Construction Projects - Focused on the Total Project Cost Management Guidelines -
Cho, Youngjun;
/
Korea Institute of Construction Engineering and Management
, v.21, no.1, pp.3-11,
|
|
2 |
A Study on Collusion Effects for Bid Award in Public Construction Works
Kim, Myeongsoo;
/
Korea Institute of Construction Engineering and Management
, v.21, no.1, pp.12-20,
|
|
3 |
A Method of Measuring Accessibility for Community Infrastructure Planning
Yhee, Hayeon;Kim, Sungpyo;Kang, Sanghyeok;
/
Korea Institute of Construction Engineering and Management
, v.21, no.1, pp.21-31,
|
|
4 |
A Case Study on the Risk Impact and Loss Cost of Temporary Aircraft Runway Construction
Kang, Hyunwook;Lee, Wonbae;Kim, Minjung;Kim, Yongsu;
/
Korea Institute of Construction Engineering and Management
, v.21, no.1, pp.32-39,
|
|
5 |
Analysis on the Factors affecting the Ruling on Construction Project Litigation - Focused on the Union Establishment of the Urban and Housing Redevelopment Project -
Kim, Yohan;Jung, Boseon;Lee, Sangyoub;
/
Korea Institute of Construction Engineering and Management
, v.21, no.1, pp.40-49,
|
|
6 |
Cost Estimation of Case-Based Reasoning Using Hybrid Genetic Algorithm - Focusing on Local Search Method Using Correlation Analysis -
Jung, Sangsun;Park, Moonseo;Lee, Hyun-Soo;Yoon, Inseok;
/
Korea Institute of Construction Engineering and Management
, v.21, no.1, pp.50-60,
|
|
7 |
A Study on Development of BIM-based Engineering Management System for Temporary Work
Choi, Changhoon;Han, Choonghee;Lee, Junbok;
/
Korea Institute of Construction Engineering and Management
, v.21, no.1, pp.61-69,
|
|
8 |
Analyzing Relationships Between Project Characteristic and Public Conflict Characteristic in Public Construction Using Fuzzy Analytical Hierarchy Process (FAHP)
Park, Sungjoon;Lee, Changjun;Han, Seung Heon;Yun, Sungmin;
/
Korea Institute of Construction Engineering and Management
, v.21, no.1, pp.70-77,
|
|
9 |
Performance Effectiveness Case Study of the Machine Guidance System for Dozer Eartwrok Grading Work
Moon, Sungwoo;Kim, Sangtae;
/
Korea Institute of Construction Engineering and Management
, v.21, no.1, pp.78-86,
|
|
10 |
An Analysis of the Causal Relations of Factors Influencing Construction Accidents Using DEMATEL Method
Kim, Dongwook;Jung, Yunho;Hong, Minki;Jang, Hyounseung;
/
Korea Institute of Construction Engineering and Management
, v.21, no.1, pp.87-98,
|
|
11 |
Causal Relationship Analysis of the Factors Lowering Productivity in Construction Job Site
Jung, Yunho;Kim, Dongwook;Hong, Minki;Jang, Hyounseung;
/
Korea Institute of Construction Engineering and Management
, v.21, no.1, pp.99-110,
|
|