Browse > Article List

논문
1 Proposal Strategy and Performance Analysis of Electronic Human Resources Management Pilot Project
Kim, Inchie;Chin, Sangyoon;Kim, Seongah;Kim, Yeasang;Lee, Sangjun;Park, Soohun; / Korea Institute of Construction Engineering and Management , v.19, no.4, pp.3-11,
2 Evaluation of Handover Requirements of Construction Information for Efficient Facility Management
Lee, Ikhaeng;Jung, Youngsoo; / Korea Institute of Construction Engineering and Management , v.19, no.4, pp.12-20,
3 Study on Management Plan of the Financial Supervisory Service According to Increase of Risk of Household Debts
Lee, YunHong; / Korea Institute of Construction Engineering and Management , v.19, no.4, pp.21-33,
4 Analysis of Defect Risk by Work Types based on Warranty Liability Period in Apartments
Kim, Sang-Hyeon;Kim, Jae-Jun; / Korea Institute of Construction Engineering and Management , v.19, no.4, pp.34-42,
5 Image based Concrete Compressive Strength Prediction Model using Deep Convolution Neural Network
Jang, Youjin;Ahn, Yong Han;Yoo, Jane;Kim, Ha Young; / Korea Institute of Construction Engineering and Management , v.19, no.4, pp.43-51,
6 An Analysis of Factors Affecting Environmental Load in Earthwork Type of Road Project
Park, Jin-Young;Im, Je-Gyu;Kim, Byung-Soo; / Korea Institute of Construction Engineering and Management , v.19, no.4, pp.52-60,
7 The Calculation Method for Prolongation cost of Sub-Constract in Domestic Public Construction Project
Jeong, Kichang;Lee, Jaeseob; / Korea Institute of Construction Engineering and Management , v.19, no.4, pp.61-69,
8 Developing a Project Management Information System for Construction Claims
Wang, Hankyeom;Park, Junil;Choi, Jaehyun; / Korea Institute of Construction Engineering and Management , v.19, no.4, pp.70-81,
9 Application of Artificial Neural Network Model for Environmental Load Estimation of Pre-Stressed Concrete Beam Bridge
Kim, Eu Wang;Yun, Won Gun;Kim, Kyong Ju; / Korea Institute of Construction Engineering and Management , v.19, no.4, pp.82-92,
10 Study of an Applicability of an Urban Design Method Using Artificial Life Theory
Lim, Myunggu;Kim, Kyoontai; / Korea Institute of Construction Engineering and Management , v.19, no.4, pp.93-101,
11 Effect of Floor Plan Characteristics on Housing Price - Focused on the Apartment in 3 Gangnam Districts since 2005 -
Bae, Sangyoung;Lee, Jaewon;Lee, Sangyoub; / Korea Institute of Construction Engineering and Management , v.19, no.4, pp.102-110,