Fuzzy-based Decision Support Model for Determining Preventive Maintenance Works Order |
Ko, Taewoo
(Department of Architecture and Architectural Engineering, Seoul National University)
Park, Moonseo (Department of Architectural Engineering, Seoul National University) Lee, Hyun-Soo (Department of Architecture and Architectural Engineering, Seoul National University) Kim, Hyunsoo (Department of Architecture and Architectural Engineering, Seoul National University) Kim, Sooyoung (Department of Architecture and Architectural Engineering, Seoul National University) |
1 | Amaratunga, D., Baldry, D. and Sarshar, M. (2000) "Assessment of facilities management performance-what next?", Facilities, 18(1), pp. 66-75. DOI |
2 | Baloi, D. and Price A, D. (2003) "Modelling global risk factors affecting construction cost performance" International Journal of Project Management 21(4), pp. 261-269. DOI ScienceOn |
3 | Bashiri, M., Badri, H. and Hejazi, T.H. (2001). "Selecting optimum maintenance strategy by fuzzy interactive linear assignment method." Applied Mathematical Modelling, 35(1), pp. 152-164. |
4 | Caccavelli, D., and Genre, J. L. (2000). "Diagnosis of the degradation state of building and cost evaluation of induced refurbishment works" Energy and Buildings, 31(2), pp. 159-165. DOI |
5 | Chang, D. Y. (1996). "Applications of the extent analysis method on fuzzy AHP." European Journal of Operations Research, 95(3), pp. 649-655. DOI ScienceOn |
6 | Douglas, J. (1996) "Building performance and its relevance to facilities management", Facilities, 14(3), pp. 23-32. |
7 | Eweda. A., Zayed. T and Alkass. S (2010) "An Integrated Condition Assessment Model for Buildings", Construction Research Congress 2010 Banff, Alberta, 8-10 May, pp. 1386-1395. |
8 | Moodi, F. and Knapton. J. (2003) "Research into a management system for Diagnosis, Maintenance, and repair of concrete Structures" Journal of Construction Engineering and Management, 129(5) pp. 555-561. DOI ScienceOn |
9 | Hao. Q. et. al., (2010), "A decision support system for integrating corrective maintenance, preventive maintenance and condition-based maintenance.", Proceedings of Construction Research congress 2010. pp.8-11. |
10 | Hipel, K. W., Radford k. J. and Fang L. (1993) "Multiple participant-multiple criteria decision making", System, Man and Cybermetrics, 23(4), pp. 1184-1189. |
11 | Jo, H., Jeong, J., Jung, J., and Lee, C. (2012). "Fuzzy based condition assessment model of middle and small-size buildings", Korean Journal of Construction Enginnering and Management, 13(5), pp. 35-44. 과학기술학회마을 DOI |
12 | Kant, J. K. and Battacharjee, B. (2012) "Application of Fuzzy Concepts to the Visual assessment of deteriorating reinforced concrete structures", Journal of Construction Engineering and Management, 138(3), pp. 399-408. DOI |
13 | Lavy, S. and Bilbo, D. L. (2009). "Facilities maintenance management practices in large public schools, Texas." Facilities, 27(1), pp. 5-20. DOI |
14 | Karwowski, W., and Mital, A. (1986) "Applications of fuzzy set theory in human factors" Vol. 6. Elsevier Science Ltd. |
15 | Kaya, T. and Kahraman, C. (2010). "Multicriteria renewable energy planning using an integrated fuzzy VIKOR & AHP methodology: the case of Istanbul." Energy, 35(6), pp. 2517-2527. DOI ScienceOn |
16 | Klir, G. J., and Yuan, B. (1995) "Fuzzy sets and fuzzy logic", New jersey Prentice Hall. |
17 | Lee, D. and Kim, Y. (2003). "A study on the Decision Making Model for Construction Projects using Fuzzy-AHP and Fuzzy-Delph", Korean Journal of Construction Enginnering and Management, 4(1), pp. 81-89. 과학기술학회마을 |
18 | Lee, M. (2009) "A study on the development of building performance evaluation model", Journal of Architectural Institute of Korea, 25(2), pp. 13-20 과학기술학회마을 |
19 | Lin, C. T. and Chen. Y. T. (2004) "Bid/no-bid decision making-a fuzzy linguistic approach" International Journal of Project Management, 22(7), pp. 585-593. DOI |
20 | Lind, H. and Muyingo, H. (2012). "Building maintenance strategies: planning under uncertainty." Property Management, 30(1), pp. 14-28. DOI |
21 | Mandani, E. H. (1977) "Application of fuzzy logic to approximate reasoning using linguistic synthesis," Computers., 100(12), pp. 1182-1191. |
22 | Opricovic, S. (1998) "Multicriteria Optimization in Civil Engineering" Faculty of Civil engineering. Belgrade. |
23 | Percy, D. F., & Kobbacy, K. A. (2000). "Determining economical maintenance intervals". International Journal of Production Economics, 67(1), pp. 87-94 DOI |
24 | Opricovic, S. (2011). "Fuzzy VIKOR with an application to water resources planning." Expert Systems with Applications, 38(10), pp. 12983-12990. DOI |
25 | Opricovic, S. and Tzeng, G. H. (2004) "Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS" European Journal of Operational Research, 156(2), pp. 445-455. DOI ScienceOn |
26 | Oyedele, L., Tham, K., Fadeyi, M., and Jaiyeoba, B. (2012). "Total Building Performance Approach in Building Evaluation: Case Study of an Office Building in Singapore." Journal of Energy Engineering, 138(1), 25-30. DOI |
27 | Pitt, T. J. (1997). "Data requirements for the prioritization of predictive building maintenance", Facilities, 15(3) pp. 97-104. DOI |
28 | Reddy, P. V., Socur, M. and Ariaratnam, S. T. (1993), "Building renovation decision support model", In Computing in Civil and Building Engineering, pp. 1547-1554 |
29 | Shohet, I. M., Lavy-Leibovich, S., & Bar-On, D. (2003). "Integrated maintenance monitoring of hospital buildings" Construction Management and Economics, 21(2), pp. 219-228. DOI |
30 | Shen, Q., and Spedding, A. (1998). "Priority setting in planned maintenance-practical issues in using the multi-attribute approach". Building Research and Information, 26(3), pp. 169-180. DOI |
31 | Silva, N. de., Dulaimi, M. F.,Ling, F. Y. and Ofori, G. (2004) "Improving the maintainability of buildings in Singapore" Building and environment, 39(10), pp. 1243-1251. DOI |
32 | Williams, B. (1993) ""What a performance!", Property Management, 11(3), pp. 190-91. |
33 | Singh, D. and Tiong, R. L. K. (2005) "A Fuzzy Decision Framework for Contractor Selection", Journal of Construction Engineering and Management, 131(1), pp. 62-70. DOI |
34 | Walczak, B., and Massart, D. L. (1999) "Rough sets theory", Chemometrics and intelligent laboratory systems, 47(1), pp. 1-16. DOI ScienceOn |
35 | Wang, T. C., Liang, L. J. and Ho, C. Y. (2006). "Multi-criteria decision analysis by using fuzzy VIKOR." Proceedings of International Conference on Service Systems and Service Management, Troyes, pp.901-906. |
36 | Zadeh, L. A. (1965). "Fuzzy sets", Information and Control, 8(3) pp. 338-353. DOI |