Browse > Article
http://dx.doi.org/10.6106/KJCEM.2014.15.1.051

Fuzzy-based Decision Support Model for Determining Preventive Maintenance Works Order  

Ko, Taewoo (Department of Architecture and Architectural Engineering, Seoul National University)
Park, Moonseo (Department of Architectural Engineering, Seoul National University)
Lee, Hyun-Soo (Department of Architecture and Architectural Engineering, Seoul National University)
Kim, Hyunsoo (Department of Architecture and Architectural Engineering, Seoul National University)
Kim, Sooyoung (Department of Architecture and Architectural Engineering, Seoul National University)
Publication Information
Korean Journal of Construction Engineering and Management / v.15, no.1, 2014 , pp. 51-61 More about this Journal
Abstract
Preventive maintenance of buildings has increased the importance of interest in that it is able to maintain the performance building has and to prevent a problem occurred in future. For improved preventive maintenance work, it should be performed to select works order clearly and preceded the accurate measurement for the state of works order. when measuring the conditions, measurement of the state of work order considering the various criteria is more effective than to measure by only criterion. But, there are something hard to evaluate exactly between the criteria because of decision-maker's subjective judgments. To solve these problems, this research proposes decision making support model to determine preventive maintenance works order using Fuzzy-sets. By using Fuzzy-sets when measuring state of work objects, it can be reduced vagueness of judgments by decision-makers. This model can be used as a tool for objective evaluation of preventive maintenance work orders and offer the guideline to perform decision-making.
Keywords
Preventive maintenance; Decision-making support model; fuzzy-Sets; AHP; VIKOR;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Amaratunga, D., Baldry, D. and Sarshar, M. (2000) "Assessment of facilities management performance-what next?", Facilities, 18(1), pp. 66-75.   DOI
2 Baloi, D. and Price A, D. (2003) "Modelling global risk factors affecting construction cost performance" International Journal of Project Management 21(4), pp. 261-269.   DOI   ScienceOn
3 Bashiri, M., Badri, H. and Hejazi, T.H. (2001). "Selecting optimum maintenance strategy by fuzzy interactive linear assignment method." Applied Mathematical Modelling, 35(1), pp. 152-164.
4 Caccavelli, D., and Genre, J. L. (2000). "Diagnosis of the degradation state of building and cost evaluation of induced refurbishment works" Energy and Buildings, 31(2), pp. 159-165.   DOI
5 Chang, D. Y. (1996). "Applications of the extent analysis method on fuzzy AHP." European Journal of Operations Research, 95(3), pp. 649-655.   DOI   ScienceOn
6 Douglas, J. (1996) "Building performance and its relevance to facilities management", Facilities, 14(3), pp. 23-32.
7 Eweda. A., Zayed. T and Alkass. S (2010) "An Integrated Condition Assessment Model for Buildings", Construction Research Congress 2010 Banff, Alberta, 8-10 May, pp. 1386-1395.
8 Moodi, F. and Knapton. J. (2003) "Research into a management system for Diagnosis, Maintenance, and repair of concrete Structures" Journal of Construction Engineering and Management, 129(5) pp. 555-561.   DOI   ScienceOn
9 Hao. Q. et. al., (2010), "A decision support system for integrating corrective maintenance, preventive maintenance and condition-based maintenance.", Proceedings of Construction Research congress 2010. pp.8-11.
10 Hipel, K. W., Radford k. J. and Fang L. (1993) "Multiple participant-multiple criteria decision making", System, Man and Cybermetrics, 23(4), pp. 1184-1189.
11 Jo, H., Jeong, J., Jung, J., and Lee, C. (2012). "Fuzzy based condition assessment model of middle and small-size buildings", Korean Journal of Construction Enginnering and Management, 13(5), pp. 35-44.   과학기술학회마을   DOI
12 Kant, J. K. and Battacharjee, B. (2012) "Application of Fuzzy Concepts to the Visual assessment of deteriorating reinforced concrete structures", Journal of Construction Engineering and Management, 138(3), pp. 399-408.   DOI
13 Lavy, S. and Bilbo, D. L. (2009). "Facilities maintenance management practices in large public schools, Texas." Facilities, 27(1), pp. 5-20.   DOI
14 Karwowski, W., and Mital, A. (1986) "Applications of fuzzy set theory in human factors" Vol. 6. Elsevier Science Ltd.
15 Kaya, T. and Kahraman, C. (2010). "Multicriteria renewable energy planning using an integrated fuzzy VIKOR & AHP methodology: the case of Istanbul." Energy, 35(6), pp. 2517-2527.   DOI   ScienceOn
16 Klir, G. J., and Yuan, B. (1995) "Fuzzy sets and fuzzy logic", New jersey Prentice Hall.
17 Lee, D. and Kim, Y. (2003). "A study on the Decision Making Model for Construction Projects using Fuzzy-AHP and Fuzzy-Delph", Korean Journal of Construction Enginnering and Management, 4(1), pp. 81-89.   과학기술학회마을
18 Lee, M. (2009) "A study on the development of building performance evaluation model", Journal of Architectural Institute of Korea, 25(2), pp. 13-20   과학기술학회마을
19 Lin, C. T. and Chen. Y. T. (2004) "Bid/no-bid decision making-a fuzzy linguistic approach" International Journal of Project Management, 22(7), pp. 585-593.   DOI
20 Lind, H. and Muyingo, H. (2012). "Building maintenance strategies: planning under uncertainty." Property Management, 30(1), pp. 14-28.   DOI
21 Mandani, E. H. (1977) "Application of fuzzy logic to approximate reasoning using linguistic synthesis," Computers., 100(12), pp. 1182-1191.
22 Opricovic, S. (1998) "Multicriteria Optimization in Civil Engineering" Faculty of Civil engineering. Belgrade.
23 Percy, D. F., & Kobbacy, K. A. (2000). "Determining economical maintenance intervals". International Journal of Production Economics, 67(1), pp. 87-94   DOI
24 Opricovic, S. (2011). "Fuzzy VIKOR with an application to water resources planning." Expert Systems with Applications, 38(10), pp. 12983-12990.   DOI
25 Opricovic, S. and Tzeng, G. H. (2004) "Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS" European Journal of Operational Research, 156(2), pp. 445-455.   DOI   ScienceOn
26 Oyedele, L., Tham, K., Fadeyi, M., and Jaiyeoba, B. (2012). "Total Building Performance Approach in Building Evaluation: Case Study of an Office Building in Singapore." Journal of Energy Engineering, 138(1), 25-30.   DOI
27 Pitt, T. J. (1997). "Data requirements for the prioritization of predictive building maintenance", Facilities, 15(3) pp. 97-104.   DOI
28 Reddy, P. V., Socur, M. and Ariaratnam, S. T. (1993), "Building renovation decision support model", In Computing in Civil and Building Engineering, pp. 1547-1554
29 Shohet, I. M., Lavy-Leibovich, S., & Bar-On, D. (2003). "Integrated maintenance monitoring of hospital buildings" Construction Management and Economics, 21(2), pp. 219-228.   DOI
30 Shen, Q., and Spedding, A. (1998). "Priority setting in planned maintenance-practical issues in using the multi-attribute approach". Building Research and Information, 26(3), pp. 169-180.   DOI
31 Silva, N. de., Dulaimi, M. F.,Ling, F. Y. and Ofori, G. (2004) "Improving the maintainability of buildings in Singapore" Building and environment, 39(10), pp. 1243-1251.   DOI
32 Williams, B. (1993) ""What a performance!", Property Management, 11(3), pp. 190-91.
33 Singh, D. and Tiong, R. L. K. (2005) "A Fuzzy Decision Framework for Contractor Selection", Journal of Construction Engineering and Management, 131(1), pp. 62-70.   DOI
34 Walczak, B., and Massart, D. L. (1999) "Rough sets theory", Chemometrics and intelligent laboratory systems, 47(1), pp. 1-16.   DOI   ScienceOn
35 Wang, T. C., Liang, L. J. and Ho, C. Y. (2006). "Multi-criteria decision analysis by using fuzzy VIKOR." Proceedings of International Conference on Service Systems and Service Management, Troyes, pp.901-906.
36 Zadeh, L. A. (1965). "Fuzzy sets", Information and Control, 8(3) pp. 338-353.   DOI