|
1 |
A Schematic Estimation Model for Structure Costs of High-rise Buildings based on Vertical and Horizontal Elements
Nam, Dong-Hee;Park, Hyung-Jin;Koo, Kyo-Jin;
/
Korea Institute of Construction Engineering and Management
, v.15, no.1, pp.3-10,
|
|
2 |
Study on the Application of Multi-skilled labors to Factory Production Process for Securing Economic Feasibility of Modular Unit
Kim, Hakcheol;Hwang, Youngkyu;Kim, Kyungrai;
/
Korea Institute of Construction Engineering and Management
, v.15, no.1, pp.11-19,
|
|
3 |
Application of Serious Games for Effective Construction Safety Training
Son, JeongWook;Shin, Seung-Woo;Yi, June-Seong;
/
Korea Institute of Construction Engineering and Management
, v.15, no.1, pp.20-27,
|
|
4 |
A Study on the Improvement of the Design VE Process using VE Idea-DataBank System
Park, Heetaek;Park, Chansik;Jung, Wooseob;
/
Korea Institute of Construction Engineering and Management
, v.15, no.1, pp.28-38,
|
|
5 |
Feasibility Study on Remodeling Project By Using Real Option Model : Focusing on Apartment House Remodeling
Yeon, JungHoon;Lee, Hyun-Soo;Park, Moonseo;Kim, Sooyoung;Ahn, Joseph;
/
Korea Institute of Construction Engineering and Management
, v.15, no.1, pp.39-50,
|
|
6 |
Fuzzy-based Decision Support Model for Determining Preventive Maintenance Works Order
Ko, Taewoo;Park, Moonseo;Lee, Hyun-Soo;Kim, Hyunsoo;Kim, Sooyoung;
/
Korea Institute of Construction Engineering and Management
, v.15, no.1, pp.51-61,
|
|
7 |
Perception and Evaluation of Construction Management Firms toward Government Policies for Construction Management
Jo, You Gyeong;Kim, Han Soo;
/
Korea Institute of Construction Engineering and Management
, v.15, no.1, pp.62-69,
|
|
8 |
Understanding Collaborative Working Processes within Construction Project Teams Using Agent-Based Modeling and Simulation
Son, JeongWook;Shin, Seung-Woo;Yi, June-Seong;
/
Korea Institute of Construction Engineering and Management
, v.15, no.1, pp.70-77,
|
|
9 |
Marketing Strategy and Influential Factors based on the Attributes of Unit Modular System
Kim, Domin;Lee, Jeongseok;Kim, Juhyung;Kim, Jaejun;
/
Korea Institute of Construction Engineering and Management
, v.15, no.1, pp.78-86,
|
|
10 |
Comparison Analysis of Environmental Performance between Reconstruction and Remodeling Alternatives for Aged - Focused on CO2 Emissions Analysis -
Kim, Chibaek;Shin, Dongwoo;Han, Juyeon;Hwang, Youngkyu;
/
Korea Institute of Construction Engineering and Management
, v.15, no.1, pp.87-100,
|
|
11 |
An Optimization Algorithm of Gypsum Board Loss for Wall Finishing in Modular Construction System
Lee, Dong-Min;Chin, Sangyoon;
/
Korea Institute of Construction Engineering and Management
, v.15, no.1, pp.101-110,
|
|
12 |
Using the Binomial Option Pricing Model for Strategic Sales of CER's to Improve the Economic Feasibility of CDM projects
Koo, Bonsang;Park, Jong-Ho;Kim, Cheong-Woon;
/
Korea Institute of Construction Engineering and Management
, v.15, no.1, pp.111-121,
|
|
13 |
Framework and Core Competency of Integrated Design Management (IDM)
Kim, Yesol;Jung, Youngsoo;
/
Korea Institute of Construction Engineering and Management
, v.15, no.1, pp.122-133,
|
|