|
1 |
Real Time Safety Management Framework at Construction Site based on Smart Mobile
Park, Moonseo;Kim, Euijun;Lee, Hyun-Soo;Lee, Kwangpyo;Suh, Sang-Wook;
/
Korea Institute of Construction Engineering and Management
, v.14, no.4, pp.3-14,
|
|
2 |
Performance Measurement Method and Case Study for BIM based Construction Simulation System
Jun, Ki-Hyun;Yun, Seok-Heon;
/
Korea Institute of Construction Engineering and Management
, v.14, no.4, pp.15-23,
|
|
3 |
Time Series Analysis and Forecast for Labor Cost of Actual Cost Data
Lee, Hyun-Seok;Lee, Eun-Young;Kim, Yea-Sang;
/
Korea Institute of Construction Engineering and Management
, v.14, no.4, pp.24-34,
|
|
4 |
Analysis of Modeling Errors for BIM-based Facility Management Systems
An, Hyokyung;Lee, Seulki;Yu, Jungho;Son, Bosik;Jang, Hyounseung;
/
Korea Institute of Construction Engineering and Management
, v.14, no.4, pp.35-45,
|
|
5 |
Analysis of Factors Influencing the Construction Business Management Success
Han, Jin-Taek;
/
Korea Institute of Construction Engineering and Management
, v.14, no.4, pp.46-54,
|
|
6 |
A Case Study of GHG Reduction Based on Electricity Consumption Pattern of Individual Rooms : In case of Seoul National University
Kim, Seok-Young;Park, Moonseo;Lee, Hyun-Soo;Kim, Sooyoung;Jung, Hye-Jin;
/
Korea Institute of Construction Engineering and Management
, v.14, no.4, pp.55-64,
|
|
7 |
A Study on the Calculation of Organization Scale in Construction Management -Focusing on Building Construction-
Ahn, Sang-Hyun;Kim, Jin-Dae;
/
Korea Institute of Construction Engineering and Management
, v.14, no.4, pp.65-72,
|
|
8 |
An Analysis of The Critical Risk Factors in Failure Cases of Lifting Equipment Plans in High-rise Construction Project
Kim, Nam-Gyun;Kim, Yea-Sang;
/
Korea Institute of Construction Engineering and Management
, v.14, no.4, pp.73-83,
|
|
9 |
Deduction of Considerations During Design and Construction by Analysing Domestic and Abroad Case Analysis of Freeform Building Envelope
Ryu, Han-Guk;
/
Korea Institute of Construction Engineering and Management
, v.14, no.4, pp.84-96,
|
|
10 |
A Study on the Estimation of Occupational Safety and Health Expense Rate by Safety Environment Change in Construction Industry
Oh, Se-Wook;Kim, Young-Suk;Choi, Seung-Ho;Choi, Jin-Woo;
/
Korea Institute of Construction Engineering and Management
, v.14, no.4, pp.97-107,
|
|
11 |
Satisfaction Level and Performance Evaluation for CM Service in Korea
Kim, Won-Tae;Chang, Chul-Ki;
/
Korea Institute of Construction Engineering and Management
, v.14, no.4, pp.108-117,
|
|
12 |
Performance Evaluation System Framework for Natural Disaster Research and Development Projects
Kim, Du-Yon;Kim, Sang-Bum;Kwak, Hyun-Jun;
/
Korea Institute of Construction Engineering and Management
, v.14, no.4, pp.118-129,
|
|
13 |
A Comparative Analysis on Safety Evaluation System and Requirement in the Tendering Process of Public Construction Projects - Cases of Singapore and Japan -
Park, Hee-Taek;Oh, Chi-Don;Park, Chan-Sik;Choi, Jin-Woo;
/
Korea Institute of Construction Engineering and Management
, v.14, no.4, pp.130-139,
|
|
14 |
Project Risk Assessment Through Construction Sequence Analyses for Industrial Plant Construction Projects
Lee, Kyusung;Choi, Jaehyun;
/
Korea Institute of Construction Engineering and Management
, v.14, no.4, pp.140-151,
|
|
15 |
Economic Analysis for a Tidal Power Plant Project using RETScreen - Focused on the Tidal Power Plant in Asan Bay
Kim, Min-Ock;Jeong, Keun-Chae;
/
Korea Institute of Construction Engineering and Management
, v.14, no.4, pp.152-163,
|
|
16 |
Development of Decision Model and Management System to minimize Pavement Utility Cut for Road Facility
Cho, Jin-Young;Jang, Oun-Sung;Lee, Min-Jae;
/
Korea Institute of Construction Engineering and Management
, v.14, no.4, pp.164-171,
|
|