|
1 |
A Study on the Outcome Evaluation Criteria of Executing Negotiation on BTL project -Focused on Cultural Facilities-
Lee, Hyun-Chul;Lee, Jae-Hong;GO, Seong-Seok;
/
Korea Institute of Construction Engineering and Management
, v.10, no.4, pp.3-13,
|
|
2 |
A Study on the Risk Evaluation of Apartment Development Project based on VE
Lee, Hyun-Chul;Shin, Seog-Bae;Hong, Ju-Hyun;Go, Seong-Seok;
/
Korea Institute of Construction Engineering and Management
, v.10, no.4, pp.14-25,
|
|
3 |
Comparison Analysis on the Informatization Level between Construction CALS and Other Sectors
Jung, In-Su;Kim, Nam-Gon;Kim, Jin-Uk;Lee, Chan-Sik;
/
Korea Institute of Construction Engineering and Management
, v.10, no.4, pp.26-37,
|
|
4 |
Business Process Model for Progress Phase of Design-Build Project
Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki;
/
Korea Institute of Construction Engineering and Management
, v.10, no.4, pp.38-49,
|
|
5 |
A Study on the Time Series Analysis of the Actual Unit Cost based on the Bid Prices
Park, Won-Young;Seo, Jong-Won;Kang, Sang-Hyeok;Choi, Bong-Joon;
/
Korea Institute of Construction Engineering and Management
, v.10, no.4, pp.50-57,
|
|
6 |
A Study on the Current Guideline Trends and Strategic Directions for Developing Open BIM Guideline
Seo, Jong-Cheol;Kim, In-Han;
/
Korea Institute of Construction Engineering and Management
, v.10, no.4, pp.58-66,
|
|
7 |
A Development of Risk Identification Checklist for Stakeholders in the Construction Phase of the Urban Regeneration-Projects
Park, Kyu-Young;Young, Moon-Serk;Kim, Seon-Gyoo;
/
Korea Institute of Construction Engineering and Management
, v.10, no.4, pp.67-75,
|
|
8 |
Development of Component Design Process for Automated Construction System
Jin, Il-Guan;Shin, Yoon-Seok;Cho, Hun-Hee;Kang, Kyung-In;
/
Korea Institute of Construction Engineering and Management
, v.10, no.4, pp.76-86,
|
|
9 |
Cost Prediction Models in the Early Stage of the Roadway Planning and Designbased on Limited Available Information
Kwak, Soo-Nam;Kim, Du-Yon;Kim, Byoung-Il;Choi, Seok-Jin;Han, Seung-Heon;
/
Korea Institute of Construction Engineering and Management
, v.10, no.4, pp.87-100,
|
|
10 |
Development of VR Simulation Algorithm and System for Supporting Optimal Road Design Information
Moon, Hyoun-Seok;Kang, Leen-Seok;
/
Korea Institute of Construction Engineering and Management
, v.10, no.4, pp.101-110,
|
|
11 |
A Case Study on Economic Analysis of a Solar Water Heating System and a Ground Source Heat Pump System Applied to a Military Building
Lee, Jong-Chan;Park, Young-Ho;Lee, Ghang;Lee, Sang-Ho;
/
Korea Institute of Construction Engineering and Management
, v.10, no.4, pp.111-118,
|
|
12 |
A Quantitative Performance Measurement on the Construction Technology R&D Projects through Research Characteristic
Park, Sang-Hyuk;Jung, Hoe-Young;Han, seung-Heon;
/
Korea Institute of Construction Engineering and Management
, v.10, no.4, pp.119-128,
|
|
13 |
A Study on Procedures and Methods for Evaluating VE Alternatives at Design Phase in Construction Projects
Choi, In-Su;Hyun, Chang-Taek;Hong, Tae-Hoon;Kim, Yun-Sik;
/
Korea Institute of Construction Engineering and Management
, v.10, no.4, pp.129-138,
|
|
14 |
The Method of Value System Management to support decision-making of Urban Regeneration Project
Kang, Hyun-Koo;Yu, Jung-Ho;Kim, Chang-Duk;Son, Bo-Sik;
/
Korea Institute of Construction Engineering and Management
, v.10, no.4, pp.139-150,
|
|
15 |
Strategic Alliance Networks in Korean Construction Industry: Network Structure and Performance of Firms
Kim, Kon-Shik;Shin, Tack-Hyun;
/
Korea Institute of Construction Engineering and Management
, v.10, no.4, pp.151-164,
|
|