|
1 |
A Bottom-up Approach Based Knowledge Management System for Construction Organizations
Park, Moon-Seo;Ahn, Chang-Bum;Lee, Hyun-Soo;Lee, Kyu-Sung;
/
Korea Institute of Construction Engineering and Management
, v.10, no.2, pp.3-13,
|
|
2 |
Construction Project Performance Management Using BSC and Data Warehouse
Park, Moon-Seo;Kim, Nam-Ho;Lee, Hyun-Soo;Ahn, Chang-Bum;Lee, Kyu-Sung;
/
Korea Institute of Construction Engineering and Management
, v.10, no.2, pp.14-25,
|
|
3 |
Approximate Estimating of Plant Construction Duration Using a Standard Schedule Model
Moon, Sung-Woo;Park, Sang-Chun;Kwon, Ki-Nam;
/
Korea Institute of Construction Engineering and Management
, v.10, no.2, pp.26-33,
|
|
4 |
Satisfaction Level of Construction Quality Management by Survey of The Field Staffs
Park, Hyeong-Geun;
/
Korea Institute of Construction Engineering and Management
, v.10, no.2, pp.34-45,
|
|
5 |
Supply-Demand Forecast of Engineers according to the Change of Construction Engineers Qualification System
Park, Hwan-Pyo;Shin, Eun-Young;
/
Korea Institute of Construction Engineering and Management
, v.10, no.2, pp.46-54,
|
|
6 |
Analysis of Domestic and International Infrastructure Asset Management Practices and Improvement Strategy
Chae, Myung-Jin;Lee, Giu;Kim, Jung-Ryul;Cho, Moon-Young;
/
Korea Institute of Construction Engineering and Management
, v.10, no.2, pp.55-64,
|
|
7 |
The Development of a Model for Selecting Method of Entry for Apartment in Remodeling an Underground Parking Lot
Song, Nak-Hyun;Jung, In-Su;Lee, Chan-Sik;
/
Korea Institute of Construction Engineering and Management
, v.10, no.2, pp.65-74,
|
|
8 |
A Study of Evaluation Process and Chart of PPC considering Variation
Moon, Hyo-Gi;Yu, Jung-Ho;Kim, Chang-Duk;
/
Korea Institute of Construction Engineering and Management
, v.10, no.2, pp.75-83,
|
|
9 |
Selection on the Order of Priority Factor of Construction Key Technology for Improving the Flexibility for a Long Life Apartment Housing at the Next Generation
Lee, Jeong-Seok;Cho, Gun-Hee;Sohn, Jeong-Rak;Kim, Jae-Jun;
/
Korea Institute of Construction Engineering and Management
, v.10, no.2, pp.84-92,
|
|
10 |
A Study on Developing the Calculation System of Disbursement for Government on the BTL Projects
Lee, Chun-Kyong;Cho, Bong-Ho;Jung, Young-Han;Park, Tae-Keun;
/
Korea Institute of Construction Engineering and Management
, v.10, no.2, pp.93-101,
|
|
11 |
A Study on the Estimation of Probabilistic Repair.Reinforcement Cycles from Rating Curve of Steel Girder Bridges
Kim, Hyun-Bae;Kim, Yong-Su;
/
Korea Institute of Construction Engineering and Management
, v.10, no.2, pp.102-110,
|
|
12 |
The Conceptual Cost Estimate Model on Preliminary Design Phase for RC Rahmen Bridge
Kim, Byung-Soo;Kwon, Suk-Hyun;
/
Korea Institute of Construction Engineering and Management
, v.10, no.2, pp.111-120,
|
|
13 |
A Study on the Fair Returns of Private Participants' Investments on BTO PPI Projects
Shin, Sung-Hwan;
/
Korea Institute of Construction Engineering and Management
, v.10, no.2, pp.121-131,
|
|
14 |
A Study on the Presumption of Construction Cost of Public Apartment by Analyzing Actual Construction Cost
Yoon, Woo-Sung;Lee, Hyun-Chul;Lee, Han-Min;Go, Seong-Seok;
/
Korea Institute of Construction Engineering and Management
, v.10, no.2, pp.132-144,
|
|
15 |
Development of the Noise Elimination Algorithm of Stereo-Vision Images for 3D Terrain Modeling
Yoo, Hyun-Seok;Kim, Young-Suk;Han, Seung-Woo;
/
Korea Institute of Construction Engineering and Management
, v.10, no.2, pp.145-154,
|
|