Browse > Article List

논문
1 Analysis of the Factors Influencing the Image of the Construction Industry
Kim, Sang-Bum;Lee, Jeong-Dae;Park, Min-Jea; / Korea Institute of Construction Engineering and Management , v.9, no.5, pp.75-85,
2 WBS Development for Acquisition and Analysis of public Housing Productivity Data
Kim, Jae-Woo;Kim, Yea-Sang;Kim, Young-Suk;Kim, Sang-Bum; / Korea Institute of Construction Engineering and Management , v.9, no.5, pp.86-94,
3 Methods for Decision making model in Apartment development projects using on Analytic Hierarchy Process
Kim, Man-Jang;Lee, Jae-Seob; / Korea Institute of Construction Engineering and Management , v.9, no.5, pp.95-103,
4 A Scheduling Method Of Dismantling Work Considering Specific Condition Of Remodeling Project - Focused on Old Aged Apartment House with Wall-Slab Structure -
Kang, Sa-Yil;Hwang, Young-Kyu;Kim, Kyung-Rai; / Korea Institute of Construction Engineering and Management , v.9, no.5, pp.104-115,
5 A Model for Safety Education Fit for Individual Personality of Construction Worker
Kim, Eun-Jeung;Shin, Dong-Woo;Kim, Kyung-Rai; / Korea Institute of Construction Engineering and Management , v.9, no.5, pp.116-126,
6 Productivity Improvement by Application of Simulation based Tunneling Operation Planning Model - focused on NATM -
Lee, Si-Wook;Woo, Sung-Kwon; / Korea Institute of Construction Engineering and Management , v.9, no.5, pp.127-136,
7 Assessment Model for Project Management Information System Based on User Satisfaction and Importance
Park, Kyoung-Ah;Lee, Jeong-Ho;Kim, Young-Suk;Han, Seung-Woo; / Korea Institute of Construction Engineering and Management , v.9, no.5, pp.137-148,
8 Development of EPC Business Process Management Model for Improving Plant Project Management
Park, Bum-Jin;Lee, Min-Jae;Lee, Tai-Sik; / Korea Institute of Construction Engineering and Management , v.9, no.5, pp.149-158,
9 The Allocation Precedence of the Limited Same Resource to the Concurrent Activities under Multiple Criteria
Hwang, Jin-Ha; / Korea Institute of Construction Engineering and Management , v.9, no.5, pp.159-167,
10 Risk-Based Performance Evaluation and Prediction Tool by Characterizing Construction Projects in Pre-Project Planning
Shin, Kang-Yong;Cha, Hee-Sung; / Korea Institute of Construction Engineering and Management , v.9, no.5, pp.168-175,
11 A Study on the Reduction of Environmental Civil Appeals for In-site Crusher Facilities
Jung, Jong-Suk;Lee, Jae-Sung;Lee, Kyoung-Hee;Jun, Myoung-Hoon;Bae, Kee-Sun; / Korea Institute of Construction Engineering and Management , v.9, no.5, pp.176-185,
12 A Study on the Technological Improvement of Strut as a Permanent Structure
Kim, Sun-Kuk;Hong, Won-Kee; / Korea Institute of Construction Engineering and Management , v.9, no.5, pp.186-193,
13 Methodology Development for Analyzing Performance of Star Technology using BSC in Construction
Park, Hwan-Pyo;Hong, Tae-Hoon;Chin, Kyung-Ho; / Korea Institute of Construction Engineering and Management , v.9, no.5, pp.194-203,
14 Availability Evaluation System for Remodeling of Existing Apartment Houses
Cha, Woo-Cul;Lim, Byung-Wook;Shin, Chang-Hyun;Shin, Byung-Hyun;Lee, Jea-Sauk;Chun, Jae-Youl; / Korea Institute of Construction Engineering and Management , v.9, no.5, pp.204-213,
15 Causes of Construction Delays of Apartment Construction Projects: Comparative Analysis between Vietnam and Korea
Kim, Young-Mok;Kim, Soo-Yong;Luu, Truong-Van; / Korea Institute of Construction Engineering and Management , v.9, no.5, pp.214-226,