|
1 |
A Survey on the Persons in Charge for Economic Estimation Analysis and Improvement of BTL Projects
Lee, Chun-Kyong;Cho, Bong-Ho;Park, Tae-Keun;
/
Korea Institute of Construction Engineering and Management
, v.8, no.4, pp.73-80,
|
|
2 |
Application System Improvement of the Codes and Standards for Plant Design
Gu, Bon-Hak;Kim, Tae-Hui;
/
Korea Institute of Construction Engineering and Management
, v.8, no.4, pp.81-89,
|
|
3 |
A Model of the Construction Risk Management System for Site Personnel in the Construction Project
Kim, Seon-Gyoo;
/
Korea Institute of Construction Engineering and Management
, v.8, no.4, pp.90-98,
|
|
4 |
A Study of Qualitative and Quantitative Risk Assessment for Highway Safety Facilities
Ji, Dong-Han;O, Yeong-Tae;Choi, Hyun-Ho;
/
Korea Institute of Construction Engineering and Management
, v.8, no.4, pp.99-109,
|
|
5 |
Prototype-based Cost Estimating Model for Building Interior Construction in Design Development Stage
Kim, Hae-Gon;Park, Sung-Chul;Hong, Tae-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin;
/
Korea Institute of Construction Engineering and Management
, v.8, no.4, pp.110-118,
|
|
6 |
A Study on developing WBS based QDBS(Quantity Database System) for the schedule and the cost data integration for road construction project
Yun, Seok-Heon;Kim, Seong-Sig;
/
Korea Institute of Construction Engineering and Management
, v.8, no.4, pp.119-127,
|
|
7 |
Development of the Construction Waste Management Performance Evaluation Tool (WMPET): Quantification of Waste Management Performance Factors and Establishment of Waste Management Performance Evaluation Tool
Kim, Jee-Hye;Shin, Dong-Woo;Cha, Hee-Sung;
/
Korea Institute of Construction Engineering and Management
, v.8, no.4, pp.128-136,
|
|
8 |
A Study on the Effectiveness Verification of Construction CRM systems
Cho, Kyoung-Rin;Hwang, Ug-Sun;Kim, Yong-Su;
/
Korea Institute of Construction Engineering and Management
, v.8, no.4, pp.137-145,
|
|
9 |
The Development of Economical Index for Site Recycling of Waste Concrete - A Case study at Hosing Development District -
Jung, Jong-Suk;Lee, Jae-Sung;Jo, Whi-Chol;Jun, Myoung-Hoon;Lee, Do-Heun;Bang, Jong-Dae;
/
Korea Institute of Construction Engineering and Management
, v.8, no.4, pp.146-154,
|
|
10 |
Development of Cost Estimating Model Using Quantity Variation Analysis by Influence Variables for the Schematic Design Phase
Son, Bo-Sik;Lee, Hyun-Soo;Kim, Sung-Tae;
/
Korea Institute of Construction Engineering and Management
, v.8, no.4, pp.155-166,
|
|
11 |
Constitution of Work Process for Apartment Renovation Project in Design Phase
Kwon, Won;Chun, Jae-Youl;
/
Korea Institute of Construction Engineering and Management
, v.8, no.4, pp.167-175,
|
|
12 |
Key Influence Factors for Efficient Cost Management of Design Stages
Woo, Yu-Mi;Song, Jong-Kwan;Cho, Kyu-Man;Lee, Hyung-Jong;Hong, Tae-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin;
/
Korea Institute of Construction Engineering and Management
, v.8, no.4, pp.176-184,
|
|
13 |
Improving Construction Operations Through Applications of 6 Sigma Management Techniques for Superstore Projects
Lee, Seung-Hyun;Lee, Hang-Bok;Park, Chan-Sik;Hong, Sung-Ho;
/
Korea Institute of Construction Engineering and Management
, v.8, no.4, pp.185-193,
|
|
14 |
A Combination Model of Earthwork equipment using System Dynamics
Won, Seo-Kyung;Han, Choong-Hee;Kim, Sun-Kuk;
/
Korea Institute of Construction Engineering and Management
, v.8, no.4, pp.194-202,
|
|
15 |
An Information-based Forecasting Model for Project Progress and Completion Using Bayesian Inference
Yoo, Wi-Sung;Hadipriono, Fabian C.;
/
Korea Institute of Construction Engineering and Management
, v.8, no.4, pp.203-213,
|
|