Browse > Article List

논문
1 A Study For An Improved BTL Project Delivery Method
Kim, Chang-Duk;Park, Hye-Sin;Lee, Mun-Jae;Yu, Jeong-Ho; / Korea Institute of Construction Engineering and Management , v.7, no.5, pp.53-63,
2 The hierarchical structures of cause-and-effect relationships on the profit factors in overseas construction projects
Han, Seung-Heon;Sun, Seung-Min;Park, Sang-Hyuk;Jung, Do-Young; / Korea Institute of Construction Engineering and Management , v.7, no.5, pp.64-76,
3 Development of Quantity based Base Period Price Index(QBPPI) to calculate Construction Cost Index
Park, Sung-Chul;Koo, Kyo-Jin;Hyun, Chang-Taek; / Korea Institute of Construction Engineering and Management , v.7, no.5, pp.77-84,
4 A Manpower Forecasting Regression Model for Apartment House Construction Project based on the Historical Data
Son, Yong-Seok;Shim, In-Bo;Kwon, Jae-Sung;Jeon, Sang-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin; / Korea Institute of Construction Engineering and Management , v.7, no.5, pp.85-93,
5 Estimating Construction Cost for Small-Sized Apartment Unit
Lee, Yoo-Seob;Kang, Tae-Kyung;Cho, Hun-Hee;Huh, Young-Ki; / Korea Institute of Construction Engineering and Management , v.7, no.5, pp.94-104,
6 A Proposal for Development of the Certification and Level System of Construction Craft Workers
Kim, Bong-Ju;Jung, Myung-Ho;Hyun, Chang-Taek;Koo, Kyo-Jin;Moon, Hyun-Seok; / Korea Institute of Construction Engineering and Management , v.7, no.5, pp.105-114,
7 Analysis on Korean Public Rental Housing Market based on System Thinking
Kim, Tae-Young;Kim, Jae-Jun;Lee, Chan-Sik;Ahn, Hee-Jin; / Korea Institute of Construction Engineering and Management , v.7, no.5, pp.115-127,
8 The Improvement of Curtain Wall Design Process using Value Stream Mapping Tools
Kim, Chang-Duk;Lee, Sang-Hyuk; / Korea Institute of Construction Engineering and Management , v.7, no.5, pp.128-137,
9 THE ROOT CAUSE ANALYSIS PROCESS FOR SCHEDULE DELAY IN CONSTRUCTION
Ji, Kun-Chang;Kim, Chang-Duk;Yu, Jung-Ho; / Korea Institute of Construction Engineering and Management , v.7, no.5, pp.138-148,
10 Development of a Prototype Equipment for Road Stripe Removing Using High Pressure Water-Jet
Kim, Kyoon-Tai;Han, Jae-Goo;Kwon, Soon-Wook; / Korea Institute of Construction Engineering and Management , v.7, no.5, pp.149-158,
11 A Study on Estimating Method for Actual Unit Cost Based on Bid Prices in Public Construction Projects
Kang, Sang-Hyeok;Park, Won-Young;Song, Soon-Ho;Seo, Jong-Won; / Korea Institute of Construction Engineering and Management , v.7, no.5, pp.159-166,
12 Application of Probabilistic Risk Analysis for Profitability-Evaluation of Apartment Reconstruction Projects
Woo, Kwang-Min;Lee, Hak-Ki; / Korea Institute of Construction Engineering and Management , v.7, no.5, pp.167-176,
13 Investigating delay factors in construction industry: A Korean perspective
Acharya, Nirmal Kumar;Im, Hae-Man;Lee, Young-Dai; / Korea Institute of Construction Engineering and Management , v.7, no.5, pp.177-190,