Browse > Article List

논문
1 A Vertical Movement Plan for Labors in High-Rise Building Construction Using Discrete-Event Simulation
Ahn Byung-Ju; / Korea Institute of Construction Engineering and Management , v.5, no.2, pp.47-54,
2 A Study on the Improvement of Public Facility Management System Using Life-cycle Management
Jeon Ick-Sung;Shon Jeong-Rak;Kim Kyung-Suk;Kim Jae-Jun; / Korea Institute of Construction Engineering and Management , v.5, no.2, pp.55-63,
3 A Development of Task Generator through an Analysis of Task Location Information Structure
Chin Sangyoon;Kang Woo-Young;Kim Yea-Sang; / Korea Institute of Construction Engineering and Management , v.5, no.2, pp.64-71,
4 Development of the Automated Vertical Controllable Pilot-type Equipment for Improving Construction Performance of PHC Piles
Cho Chang-Yeon;Lee Junbok;Kim Han-Soo;Kim Jeoung-Tae;Cho Moon-Young; / Korea Institute of Construction Engineering and Management , v.5, no.2, pp.72-80,
5 Assessment of Advanced Joining Technologies for Metal Pipe in the Construction Industry
Kim Chang-Wan; / Korea Institute of Construction Engineering and Management , v.5, no.2, pp.81-89,
6 The Development of a Machine Vision Algorithm for Automation of Pavement Crack Sealing
Yoo Hyun-Seok;Lee Jeong-Ho;Kim Young-Suk;Kim Jung-Ryeol; / Korea Institute of Construction Engineering and Management , v.5, no.2, pp.90-105,
7 Material Planning Model for Multi-Project Management in Medium-sized Construction Companies
Jung Sung-Lim;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo; / Korea Institute of Construction Engineering and Management , v.5, no.2, pp.106-114,
8 Weight Evaluation of Risk Factors for Early Construction Stage
Hwang Ji-Sun;Lee Chan-Sik; / Korea Institute of Construction Engineering and Management , v.5, no.2, pp.115-122,
9 A Study of Methods on Safety Checklist Improvement and Integrated Operation with Schedule for Construction Accident Prevention
Yang Yong-Cheol;Choi Hoon;Kim Jae-Jun; / Korea Institute of Construction Engineering and Management , v.5, no.2, pp.123-135,
10 A Risk Management Method Using Fuzzy Theory for Early Construction Stage
Hwang Ji-Sun;Lee Chan-Sik; / Korea Institute of Construction Engineering and Management , v.5, no.2, pp.136-143,
11 Facilitating the Usage of Value Management Processes by Charactering Capital Facility Projects
Cha Hee Sung; / Korea Institute of Construction Engineering and Management , v.5, no.2, pp.144-152,
12 Development of Construction Project Control System for Large Sized Construction by Process and Data Modeling
Choi Yoon-Ki;Lee Hyun-Soo;Hwang Young-Sam;Kim Young-Suk;Kim Woo-Young;Song Young-Woong; / Korea Institute of Construction Engineering and Management , v.5, no.2, pp.153-161,
13 A Study on the Development of an Automated Pavement Crack Sealer
Lee Jeong-Ho;Yu Hyun-Seok;Kim Young-Suk;Lee Jun-Bok;Cho Moon-Young; / Korea Institute of Construction Engineering and Management , v.5, no.2, pp.162-171,
14 Problems and Solutions for the Private-funded Railroad Station Project Management
Park Chan-Sik;Jeon Yong-Seok; / Korea Institute of Construction Engineering and Management , v.5, no.2, pp.172-180,
15 A Study on the Design Value Analysis Model Using Probabilistic LCC Analysis of Water Supply System Project
Jung Pyung-Ki;Seo Jong-Won;Lim Jong-Kwon; / Korea Institute of Construction Engineering and Management , v.5, no.2, pp.181-193,
16 An Analysis of Planning Practice for Reinforced Concrete Core-Wall Construction in High-Rise Building Construction
Ahn Byung-Ju; / Korea Institute of Construction Engineering and Management , v.5, no.2, pp.194-201,
17 A Management Performance Measurement Model of the Construction Engineering Firm -Focused on 'H' Construction Engineering Firm-
Park Chan-Sik;Kim Hyun-Jun;Jeon Yong-Seok; / Korea Institute of Construction Engineering and Management , v.5, no.2, pp.202-210,
18 Organizational Program Management of Multiple Maintenance Projects Under Fund Constraints
Koo Kyo-Jin; / Korea Institute of Construction Engineering and Management , v.5, no.2, pp.211-218,