|
1 |
A Study on the Method of New Activity Based Cost Management Coping with Changes in the Cost Structure of Real Estate Construction Industry
Lee Jeong-Min;
/
Korea Institute of Construction Engineering and Management
, v.4, no.4, pp.69-79,
|
|
2 |
A Study on the Tact Management Using a Daily Report Information
Kim Sun-Kuk;Na Kwang-Soo;Kim Tea-Hui;Yu Jung-Ho;Lee Hyun-Soo;Kim Chang-Duk;
/
Korea Institute of Construction Engineering and Management
, v.4, no.4, pp.80-87,
|
|
3 |
A Study on the Development of Dewatering Mold Form for Performance Improvement of Concrete
Woo Kwang-Min;Lee Hak-Ki;
/
Korea Institute of Construction Engineering and Management
, v.4, no.4, pp.88-95,
|
|
4 |
Improving the Performance of a Custom-built Apartment Efficiently
Han Song-Yi;Choi Jae-Kyu;Kim Kyung-Sook;Kim Jae-Jun;
/
Korea Institute of Construction Engineering and Management
, v.4, no.4, pp.96-105,
|
|
5 |
The Research about Increase and Decrease of the Construction Cost by the Alteration of Design
Im Chil-Soon;Lee Gyu-Chel;
/
Korea Institute of Construction Engineering and Management
, v.4, no.4, pp.106-113,
|
|
6 |
A Study on Improving Forecasting Accuracy for Expenditures of Residential Building Projects through Selecting Similar Cases
Yi June-Seong;
/
Korea Institute of Construction Engineering and Management
, v.4, no.4, pp.114-122,
|
|
7 |
A Study on the Process Improvement of Budgeted Cost of Earned Value Management in Multiple Apartment Project
Yang Yong-Cheol;Kim Sang-Hee;Kim Jae-Jun;
/
Korea Institute of Construction Engineering and Management
, v.4, no.4, pp.123-136,
|
|
8 |
An Investigative Study on the Structural Characteristics of High-Rise Complexes in Korea
Kang Suk-Won;Lee Sung-Ho;
/
Korea Institute of Construction Engineering and Management
, v.4, no.4, pp.137-144,
|
|
9 |
Development and Application of TACT Management System
Suh Sang-Wook;Kim Jae-Ho;Kim Sun-Kuk;Kim Chang-Duk;Lee Hyun-Soo;
/
Korea Institute of Construction Engineering and Management
, v.4, no.4, pp.145-154,
|
|
10 |
Forecast on Internal Condensation at Balcony Ceiling of Super-high Apartment Building Faced with Open Air
Choi Yoon-Ki;Ahn Jae-Bong;
/
Korea Institute of Construction Engineering and Management
, v.4, no.4, pp.155-163,
|
|
11 |
The Study on Correlation Between Factors Decreasing Construction Productivity and Waste Factors with Relation to Lean Construction
Park Joo-Hyun;Kim Dae-Young;Lee Hak-Ki;
/
Korea Institute of Construction Engineering and Management
, v.4, no.4, pp.164-172,
|
|
12 |
Development of the Pilot Type Machine for Automation of PHC Pile Cutting Work
Lee Jeong-Ho;Park Sang-Jun;Jeong Myung-Hoon;Kim Young-Suk;
/
Korea Institute of Construction Engineering and Management
, v.4, no.4, pp.173-181,
|
|
13 |
Development of the lift-up and procurement system for Just-in-Time in the Building Construction
Shin Bong-Soo;Kim Chang-Duk;Suh Sang-Wook;Lim Hyoung-Chul;Choi Woon-Ki;
/
Korea Institute of Construction Engineering and Management
, v.4, no.4, pp.182-191,
|
|
14 |
A Study on the Construction of Computerized Algorithm for Proper Construction Cost Estimation Method by Historical Data Analysis
Chun Jae-Youl;
/
Korea Institute of Construction Engineering and Management
, v.4, no.4, pp.192-200,
|
|
15 |
A Study on the Cost Risk Analysis Method for Construction Projects
Lee Dong-Un;Kim Yeong-Su;
/
Korea Institute of Construction Engineering and Management
, v.4, no.4, pp.201-211,
|
|
16 |
Development of Construction Cost Model through the Analysis of Critical Work Items
Lee Yoo-Seob;
/
Korea Institute of Construction Engineering and Management
, v.4, no.4, pp.212-219,
|
|
17 |
Case Study on Development of Residential Building Cost Index Compilation Model
Cho Hun-Hee;Lee Yoo-Seob;Kang Tai-Kyung;
/
Korea Institute of Construction Engineering and Management
, v.4, no.4, pp.220-226,
|
|