|
1 |
Development of Learning Model for Knowledge Management in Construction Area
Jung In-Su;Kim Byung-Kon;Na Hei-Suk;
/
Korea Institute of Construction Engineering and Management
, v.3, no.1, pp.65-73,
|
|
2 |
A Comparative Study on Domestic and Foreign the Follow-up Service of Temporary Equipment and Materials
Woo Kwang-Min;;
/
Korea Institute of Construction Engineering and Management
, v.3, no.1, pp.74-82,
|
|
3 |
A Study on the Actual Construction Database Modeling and Application for Commercial Buildings
Kim Sun-Kuk;Lee Sung-Ho;Kim Tae-Hui;Joo Jin-Kyu;
/
Korea Institute of Construction Engineering and Management
, v.3, no.1, pp.83-90,
|
|
4 |
The flow of Temporary Facility Planning Information in High-rise Building Construction
Yoon You-Sang;Lee Hyung-Soo;Suh Sang-Wook;
/
Korea Institute of Construction Engineering and Management
, v.3, no.1, pp.91-96,
|
|
5 |
A Study on the Estimating Strategy for the Design Phase VE Consulting Fee
Kim Chul-Woong;Jung Young Il;Kim Yang-Taek;Hyun Chang-Taek;
/
Korea Institute of Construction Engineering and Management
, v.3, no.1, pp.97-106,
|
|
6 |
A Model of the Risk Response Repeat Process in the Construction Project
Kim Seon-Gyoo;
/
Korea Institute of Construction Engineering and Management
, v.3, no.1, pp.107-114,
|
|
7 |
A Study on the Flaw Prevention Countermeasure of Crack in Apartment House Underground Parking Area
Jung Soon-Oh;Suh Sang-Wook;
/
Korea Institute of Construction Engineering and Management
, v.3, no.1, pp.115-123,
|
|