|
1 |
The Critical Factors of Project Management in Sudanese Construction Projects
Hakami, Waled Gaber Mohammed;Yousif, Mohamed Ibrahim;
/
Korea Institute of Construction Engineering and Management
, v.4, no.1, pp.1-7,
|
|
2 |
Incompetent Construction Technologies and Resources in the Construction Industry of Yemen
Sultan, Basil;Alaghbari, Wa'el;
/
Korea Institute of Construction Engineering and Management
, v.4, no.1, pp.8-14,
|
|
3 |
Effect of Inadequate Design on Cost and Time Overrun of Road Construction Projects in Tanzania
Rwakarehe, Eradius E.;Mfinanga, David A.;
/
Korea Institute of Construction Engineering and Management
, v.4, no.1, pp.15-28,
|
|
4 |
Risk Ranking for Tunnelling Construction Projects in Malaysia
Ghazali, F.E. Mohamed;Wong, H.C.;
/
Korea Institute of Construction Engineering and Management
, v.4, no.1, pp.29-36,
|
|
5 |
A Health and Safety Improvement Roadmap for the Construction Industry
Diugwu, Ikechukwu A.;Baba, Dorothy L.;
/
Korea Institute of Construction Engineering and Management
, v.4, no.1, pp.37-44,
|
|
6 |
A Modified-AHP Method of Productivity Analysis for Deployment of Innovative Construction Tools on Construction Site
Kwon, Soonwook;Lee, Gaeyoung;Ahn, Dooyong;Park, Hee-Sung;
/
Korea Institute of Construction Engineering and Management
, v.4, no.1, pp.45-50,
|
|