Wetland systems are widely accepted natural water purification systems around the world in nonpoint sources pollution control. Constructed wetlands have become a popular technology for treating contaminated surface and wastewater. In this study, the field experiment to reduce nonpoint source pollution loadings from polluted stream waters using wetland system was performed from June 2002 to March 2004, including winter performance using four newly constructed wetlands. The Dangjin stream water flowing into Seokmun estuarine lake was pumped into wetlands, and inflow and hydraulic residence time of the system was $500m^{3}{\~}1500m^{3}/day\;and\;2{\~}5$ days respectively. After 3 years operation plant-coverage was about $80~90\%$ from zero at initial stage even with no plantation. Average water quality of the influent in growing season was BOD_{5}\;3.96mg/L$, TSS 22.98 mg/L, T-N 3.29 mg/L, T-P 0.30 mg/L. The average removal rate of four wetlands for $BOD_{5},\;TSS,\;T-N\;and\;T-P$ in growing season was $24\%$, $62\%$, $54\%$, and $51\%$, respectively. And average water quality of the influent in winter season was $BOD_{5}$ 4.92 mg/L, TSS 12.47 mg/L, T-N 5.54 mg/L, and T-P 0.32 mg/L, respectively. The average removal rate of four wetlands for them was $-21\%$. $23\%$, $33\%$, and $53\%$, respectively. The reason of higher BOD_{5} effluent concentration in winter season might be that low temperature restrained microorganism activity and a organic body from the withered plant and algae was flown out. Except the result of $BOD_{5}$, the effectiveness of water quality improvement in winter season was satisfactory for treating polluted stream waters, and $BOD_{5}$ variation was within the range of background concentration. Performance of the experimental system was compared with existing data base (NADB), and it was within the range of general system performance. Overall, the wetland system was found to be satisfactory for NPS control such as improvement of polluted stream water.