Acknowledgement
이 연구는 2020년도 한국연구재단 연구비 지원에 의한 결과의 일부임. 과제번호:2020R1A2C100666212
References
- MoEL(Ministry of Employment and Labor) (2021). Industrial Accident Statistics. Retrieved March 13, 2023 from https://www.moel.go.kr/policy/policydata/view.do?bbs_seq=20221201394
- MoLIT(Ministry of Land, Infrastructure and Transport) (2022a). KDS 21 60 00 Retrieved March 13, 2023 from https://www.kcsc.re.kr/StandardCode/Viewer/41028
- MoLIT(Ministry of Land, Infrastructure and Transport) (2022b). KCS 21 60 05 Retrieved March 13, 2023 from https://www.kcsc.re.kr/StandardCode/Viewer/41028
- Park, J.K. (2015). The Survey of the Current Situation for System Scaffolding in the Domestic Construction Site(II), Journal of the Korean Society of Safety, 30(2), 35-40 https://doi.org/10.14346/JKOSOS.2015.30.2.35
- MoLIT(Ministry of Land, Infrastructure and Transport) (2022c). KCS 21 60 10 Retrieved March 13, 2023 from https://www.kcsc.re.kr/StandardCode/Viewer/41028
- MoLIT(Ministry of Land, Infrastructure and Transport) (2022d). KDS 21 10 00 Retrieved March 13, 2023 from https://www.kcsc.re.kr/StandardCode/Viewer/41028
- MoLIT(Ministry of Land, Infrastructure and Transport) (2022e). KDS 21 50 00 Retrieved March 13, 2023 from https://www.kcsc.re.kr/StandardCode/Viewer/41028
- MoLIT(Ministry of Land, Infrastructure and Transport) (2022f). KDS 41 12 00 Retrieved March 13, 2023 from https://www.kcsc.re.kr/StandardCode/Viewer/41028
- MoLIT(Ministry of Land, Infrastructure and Transport) (2022g). KDS 14 30 00 Retrieved March 13, 2023 from https://www.kcsc.re.kr/StandardCode/Viewer/41028
- KOSHA(Korea Occupational Safety and Health Agency) (2020). KOSHA Guide, C-30-2020 Retrieved March 13, 2023 from https://www.kosha.or.kr/kosha/data/guidanceC.do
- KOSHA(Korea Occupational Safety and Health Agency) (2020). KOSHA Guide, C-32-2020 Retrieved March 13, 2023 from https://www.kosha.or.kr/kosha/data/guidanceC.do
- Lee, S.H., & Choi, B.J. (2017). An Analytical Study for Safety Check of Vertical Wale Spacing of steel Pipe Scaffolding, Journal of the Regional Association of Architectural Institute of Korea, 19(6), 149-157.
- Lee, J.S., Moon, S.O., Youn Y.B., Lim N.G., & Oh, T.K. (2018). Study on the Safety Assurance for the Temporary Structures, Journal of the Korean Society of Safety, 33(1), 73-80.
- Mo, S.W. (2022). Installation standards study for different types of steel pipe scaffolding based on structural analysis, Ph.D. Dissertation, TongMyong University
- Cho, B.S., Kim, J.H., Kim, H.S., Jeong, T.H., Park, C.J., & Son, K.Y. (2019). Comparative Analysis of Economic Feasibility and Safety between Steel and System Scaffolds in Small Construction Sites, Korea Institute of Construction Engineering and Management, 307-310
- SMG(Seoul Metropolitan Government)(2019). Seoul Metropolitan City Building Dismantling Construction Safety Management Manual. Retrieved March 13, 2023 from https://news.seoul.go.kr/citybuild/archives/506997
- KATS(Korea Agency for Technology and Standards) (2021). Components and accessories for prefabricated steel pipe scaffolding, KS F 8003 Retrieved March 13, 2023 from https://www.standard.go.kr/KSCI/standardIntro/getStandardSearchView.do?menuId=503&topMenuId=502&ksNo=KSF8003&tmprKsNo=KSF8003&reformNo=11