DOI QR코드

DOI QR Code

A Study on Safety Standards for the Interior of an Artillery Firing Range Considering Probable Error

공산오차를 고려한 국내 포병사격장 안전기준 분석 연구

  • Juhee Kim (Dept. of Mechanical and Systems Engineering, Korea Military Academy) ;
  • Kieun Sung (Dept. of Political Sicence and Sociology, Korea Military Academy)
  • 김주희 (육군사관학교 기계시스템공학과) ;
  • 성기은 (육군사관학교 정치사회학과)
  • Received : 2023.01.15
  • Accepted : 2023.03.27
  • Published : 2023.04.05

Abstract

Safety standards for long-range artillery ammunition test and training sites follow the US artillery shooting range safety zone standards. Although the South Korean geographical conditions of shooting ranges are different from those of the United States, there is no safety standard reflecting the South Korean topographical characteristics. Probable error associated with the shooting range, trajectory should be considered in establishing the safety standards. In this study, we present the safety standards for the ammunition testing site suitable for the Korean situation, with applying a concept of trajectory and probable error differed by ammunition type, which are currently confirmed by the South Korean Army's artillery shooting.

Keywords

Acknowledgement

본 논문은 육군사관학교 화랑대연구소의 2023년도 연구활동비 지원을 받아 연구되었음.

References

  1. U.S. Army "Regulation 385-63-Policy and Procedures for Firing Ammunition for Training, Target, Practice and Combat," Department of the Army and Navy, Washington, DC., 1983. 
  2. J. G. Kang et al., "'Probable Error' as an EIA Method to Define Project Impact Area," Journal of Environmental Impact Assessment, Vol. 16, No. 6, pp. 495~502, 2007. 
  3. J. I. Park et al., "A Study on Loaction Requirments of Artillery Firing Range for Long-Range Fire Training," Korea Journal of Military Arts and Science, Vol. 74, No. 2, pp. 267-279, 2018.  https://doi.org/10.31066/kjmas.2018.74.1.011
  4. J. H. Kim et al., "A Feasibility Study for the Construction of an 000 Artillery Ammunition Test Site," Defense Agency for Technology and Quality, Inje, Kangwon-do, pp. 93-114, June, 2022. 
  5. J. H. Kim et al. "Analysis of Safety Standards for the Interior of an Artillery Firing Range," KIMST Annual Conference Proceedings, Daejoen, pp. 697-698, November, 2022. 
  6. Korea Army Headquarters, "Standard Training Ground Installation Criteria," Korea Army Headquarters, p. 105, 2019. 
  7. Korea Army Headquarters, "155 mm Howitzer Basic Resignation 32-0," Korea Army Headquarters, 2013. 
  8. J. S. Lee et al., "A Study on the Effective Method to Producing Data for the ROKA Live Fire Training Range Safety," Journal of Korea Society of Industrial and Systems Engineering, Vol. 38, No. 3, pp. 64-77, September, 2015.  https://doi.org/10.11627/jkise.2015.38.3.64
  9. Korea Army Headquarters, "Research on Establishment of Criteria for Standard Training Grounds in 2022," Korea Institute for Crisis management Analysis, pp. 6-17, 2022.