Acknowledgement
본 연구는 한국연구재단 이공분야기초연구(NRF-2022R1I1A3068942)에 의해 일부 연구비가 지원되었으며, 이에 감사드립니다.
References
- An, S.H. (2017). "Issues and activation plan of the Construction dispute conciliation System." International journal of negotiation, 20(2), pp. 83-117.
- Chang, C.K. (2013). "Suggestions on Efficient Cost Management for Public Construction Projects : Focused on Total Project Cost Management System." Korean Journal of Construction Engineering and Management, KICEM, 14(3), pp. 12-21. https://doi.org/10.6106/kJCEM.2013.14.3.012
- Cho, Y.J. (2019). "Systematic Improvement for Effective Operation of Long-Term Continuous Construction Contracts." Korean Journal of Construction Engineering and Management, KICEM, 20(6), pp. 3-10.
- Han, S.J., and Woo, S.K. (2021). "Causes and Directions for Improvement of Additional Industrial Safety and Health Management Expenses due to the Extension od Time." KICEM Annual Conference 2021, pp. 119-120.
- Jeong, K.C., and Lee, J.S. (2017). "Improvement of the Calculation Standard for Prolongation cost of Long-term Continuing Contracts Construction Project." Korean Journal of Construction Engineering and Management, KICEM, 18(2), pp. 30-37. https://doi.org/10.6106/KJCEM.2017.18.2.030
- Jung, Y.C. (2020). "Restructuring of the Legal Theory on the Long-term Continuous Construction Contract under the National Contract Law." Public Law, 48(3), pp. 313-337. https://doi.org/10.38176/PublicLaw.2020.02.48.3.313
- Kim, S.B. et al.(2008). "An Empirical Study on the Effect of Public Construction Industry by Expansion of New Budget System." Korean Journal of Construction Engineering and Management, KICEM, 9(3), pp. 153-163.
- Kim, T.K. (2018). "Study on the right to claim for expenses incurred upon extension of construction period in the construction contract general conditions : Focusing on comparison and examination with creditor delay." DONG-A LAW REVIEW, (78), pp. 275-305.
- Kim, T.K. (2021). "Research on the Legal Nature of So-called General Contracts in Long-term Continuous Construction Contracts : Focusing on the Supreme Court 2018. 10. 30. Judgment 2014 Da 235189 en banc decision." Ilkam Law Review, 48(0), pp. 45-82.
- Krueger, R.A., and Casey, M.A. (2008). Focus groups : A Practical Guide for Applied Research (4th Edition), Thousand Oaks, CA: Sage.
- Lee, J.H., and Shin, M.J. (2021). "Legal Issues Concerning the Extension of the Construction Period and the Adjustment of the Contract Price in the Long-term Construction Contract." Ilkam Real Estate Law Review, 23(0) pp. 303-341.
- Lee, S.H. (1996). "Problems and Improvement of the Long-Term Continuing Construction Contracts." Construction Economy Research Institute of Korea (CERIK) Issue Focus, 7.
- Lee, S.J., Cha, Y.W., Han, S.W., and Hyun, C.T. (2021). "A Rating Method for the Estimation of the Additional Overhead Expenses incurred by Schedule Extension in Public Construction Projects." Korean Journal of Construction Engineering and Management, KICEM, 22(3), pp. 79-90.
- Park, S.H., Lee, J.K., Yang, C.H., Lee, J., and Kang, Y.K. (2021). "Derivation of Design Elements for Connection through Urban Underground using FGI Method." International journal of highway engineering, 23(2), pp. 129-136. https://doi.org/10.7855/IJHE.2021.23.2.129
- Park, S.W. (2018). "A Short Essay on Overhead Cost and Time Extension Issues in Government Long-Term Continuing Construction Contracts." Korea Law Review, 89, pp. 117-173. https://doi.org/10.36532/kulri.2018.89.117
- Song, K. (2018). "A Study on the Purpose of Introducing Long Term Construction Contract." The Graduate School of Railroad Woosong University.
- Stewart, D.W., and Shamdasani, P.N. (2014). Focus groups : Theory and Practice (3th Edition), Newbury Park, CA: Sage.
- Ministry of Economy and Finance (MOEF) (2022). Notice on Decision for Disclosure Information (Registration Number : 10042415).
- The Board of Audit and Inspection of Korea (BAI) (2018). Audit Reports, Seoul, Korea.