Abstract
Switching surges are a common type of phenomenon that occur on any sort of power system network. These are more pronounced on long transmission lines and in high voltage converter stations. At AC/DC hybrid transmission lines, the insulation coordination of such lines is mainly dictated by the peak level of switching surges, the most dangerous of which include three phase line energization and AC/DC converter station. The power system structure consist of AC/DC hybrid transmission lines which is combination of AC 765kV and ±500kV HVDC 1 bipole system for contingency analysis. The power system under study and its components are simulated using EMTDC software package, the effects of the various AC/DC mixing power lines are reviewed. The developed models of EMTDC conversion lines based on combination of AC/DC system are simulated and the characteristics of switching surge over-voltage from its results are discussed.
개폐서지는 전력시스템에서 발생하는 과전압 현상 중의 하나이며 변전소의 차단기 등 개폐장치의 동작이나 송전선로의 고장으로 인해 발생한다. 특히 송전선로의 절연설계를 위하여 개폐서지의 피크를 산정하는 것은 매우 중요하고 AC/DC 병가선로의 안정적인 운영을 위한 절연협조의 기본적인 검토항목이다. 본 논문에서는 새로운 AC/DC 병가구조의 전력시스템에 대한 상정해석을 위하여 AC 765kV와 DC ±500kV Bi-Pole 시스템이 조합된 송전선로를 대상으로 하였다. 일반적으로 교류 송전시스템의 절연설계를 위한 비정상적인 과전압은 외부과전압으로 낙뢰에 의한 과전압과 내부과전압으로 개폐에 의한 과전압을 고려한다. 직류 송전시스템의 경우에는 개폐에 의한 과전압 보다 송전선로의 중간에서 지락고장이 발생하면 인접한 정상선로에 유기되는 내부과전압을 개폐서지라하며 직류송전선로에 유기되는 가장 큰 일시적인 과전압을 의미한다. 본 논문의 연구목적으로 구성된 선로에 대하여 EMTDC 소프트웨어를 사용하여 모의하였으며, 다양한 AC/DC 혼합 형태에 대한 개폐과전압의 영향을 검토하였다.