Acknowledgement
본 연구는 한국연구재단의 이공분야 기초연구사업(Shield TBM 배토처리 향상을 위한 Soil conditioning 기술 개발, NRF-2018R1A2B6002725)의 지원으로 수행되었으며 이에 깊은 감사를 드립니다.
References
- Cho, J.W., Yu, S.H., Jeon, S.W., Chang, S.H. (2008), "Numerical study on rock fragmentation by TBM disc cutter", Journal of Korean Tunnelling and Underground Space Association, Vol. 10, No. 2, pp. 139-152.
- Chang, S.H. (2015), "A consideration for mechanical rock excavation focusing on TBM and roadheader", Journal of the Korean Society of Mineral and Energy Resources Engineers, Vol. 52, No. 5, pp. 531-548. https://doi.org/10.12972/ksmer.2015.52.5.531
- Ham, S.K., Jung, H., Kim, B.J., Jeong, K.H., Lee, S.W. (2020), "Waterproofing performance evaluation according to the number of layer for shield TBM segment hydrophilic rubber waterstop", Journal of Korean Tunnelling and Underground Space Association, Vol. 22, No. 1, pp. 47-58. https://doi.org/10.9711/KTAJ.2020.22.1.047
- Hwang, B.H., Kim, S.H., Lee, K.H., An, J.K., Cho, S.W., Kim, Y.D. (2020), "A basic study on the mixing bar interaction efficiency in shield TBM chamber", Journal of Korean Tunnelling and Underground Space Association, Vol. 22, No. 1, pp. 91-105. https://doi.org/10.9711/KTAJ.2020.22.1.091
- Kim, S.H., Oh, T.S., Park, S.H., Lee, C.Y., Park, J.K. (2014), "Development of simulation equipment system on EPB shield TBM hood operation", Journal of Korean Tunnelling and Underground Space Association, Vol. 16, No. 2, pp. 193-201. https://doi.org/10.9711/KTAJ.2014.16.2.193
- Kim, W.S. (2020), A study on chamber pressure of EPB shield TBM with measurement data analysis of under the river, Doctorate Student Thesis, Woosong University, pp. 6-8.
- Park, H.K., Chang, S.B., Lee, S.B. (2015), "A study of shield TBM tunnelling-induced volume loss estimation considering shield machine configurations and driving data", Tunnel and Underground Space, Vol. 25, No. 5, pp. 397-407. https://doi.org/10.7474/TUS.2015.25.5.397
- Sagong, M., Jung, C.K., Moon, J.B., Kim, J.Y., Yun, D.S., Yu, M.H (2015), "A manual for the revised TBM tunnel specification", Journal of Korean Tunnelling and Underground Space Association, Vol. 17, No. 4, pp. 415-428. https://doi.org/10.9711/KTAJ.2015.17.4.415
- Yoon, D.H., Song, J.J. (2019), "Review on design of underground mine openings in Korea and overseas", Tunnel and Underground Space, Vol. 29, No. 1, pp. 30-37. https://doi.org/10.7474/TUS.2019.29.1.030
- You, S.H., Chang, S.H., Cho, J.W., Jeon, S.W. (2008), "Estimation of the optimum TBM disc cutter spacing by the dynamic fracture modeling", Journal of Korean Tunnelling and Underground Space Association, Vol. 10, No. 1, pp. 81-90.