Fig. 1. Group Interview career
Fig. 2. Risk assessment comparison before and after improvement
Fig. 3. Comparison of work steps before and after improvement
Fig. 4. MDW Reinforcement and formwork installation
Fig. 5. MDW unloading and installation
Fig. 6. MDW support and base anchor installation after MDW assembly
Fig. 7. MDW concrete pouring
Table 1. Risk Evaluation(4x4 Matrix)
Table 2. Project Description (Projcet No. 1)
Table 3. Risk Evaluation(risk by score)
Table 4. Scaffold construction risk assessment table
Table 5. Installation of retaining wall formwork, dismantling risk assessment
Table 6. Rebar installation risk assessment
Table 7. When pouring concrete Risk assessment
Table 8. Project Description (Projcet No. 2)
Table 9. Evaluation for Alternatives
Table 10. Risk assessment during MDW member entry and installation
Table 11. Risk Assessment of MDW Plate Reinforcement
Table 12. Risk assessment for MDW concrete pouring
Table 13. Comparison of risk assessment when existing quay exterior wall formwork and MDW improvement
References
- S. H. Lee, Impact of Fluctuations in Construction Business on Insolvency of Construction Company by Size, Journal of the Korea Academia-Industrial cooperation Society, Vol. 17, No. 8, pp. 147-156, 2016. DOI: http://dx.doi.org/10.5762/KAIS.2016.17.8.147
- N. K. Baek, J. P. Hong, H. C. Lim, Survey on the Actual Condition and the Improvement Factors of Foreign Workers at the Construction Site, Journal of the Korea Academia-Industrial cooperation Society, Vol. 19, No. 1, pp. 136-145, 2018. DOI: http://dx.doi.org/10.5762/KAIS.2018.19.1.136
- Korea Occupational Safety & Health Agency, KOSHA DATA, Industrial Disaster Statistics, 2016.
- Ministry of Employment and Labor, Occurrence of Industrial Accident at the end of June 2018.
- S. W. Shin, C. B. Son, An Analysis on the Relationship between Occurrence Type and Influence Factor of Construction Safety Accident using SNA Method, Journal of the Architectural Institute of Korea Structure & Construction, Vol. 33, No. 4, Serial No. 342, pp. 47-54, 2017. https://doi.org/10.5659/JAIK_SC.2017.33.4.47
- Ministry of Land, Infrastructure and Transport Conversion of construction site safety management from countermeasure to prevention, Press Releases Jan 2016.
- J. Y. Shin, Development Plan of Design for Safety in Construction, Tunnel & Underground Space, Vol. 27, No. 6, pp. 351-356, 2017. https://doi.org/10.7474/TUS.2017.27.6.351
- A. Gibb, R. Haslam, S. Hide and D. Gyi, The role of design in accident causality, In Hecker S, Gambatese J & Weinstein M(Eds), Designing for Safety and Health in Construction: Proc., Research and Practice Symposium, UO Press, Eugene, pp. 11-21, 2004.
- M. Behm, Linking construction fatalities to the design for construction safety concept, Safety Science, 43, pp. 589-611, 2005. https://doi.org/10.1016/j.ssci.2005.04.002
- Korea Occupational Safety & Health Agency, KOSHA DATA, Industrial Disaster Statistics, 2014.
- S. H. Hong. "Total Safety Management System by Owner's Leading for the Effective Prevention of Construction Accidents, Journal of the KOSOS, Vol.20 No.3. pp164-173, 2005.
- Korea Occupational Safety & Health Agency, KOSHA DATA, Disaster Prevent Activities by
- Ministry of Land, Infrastructure and Transport, Design of Safety Task Manual, 2017. Country, Department of statistic Singapore, 2016.
- Korea Workers' Compensation & Welfare Service. Guidance on risk assessment of workplace, Dec 2014.
- J. H. Moon. Choi H. C, MDW Structural Performance Test Report, Hannam University, pp. 1-11, 2016.
- Y. H. Oh, Evaluation Study on the integral of the PC and the RC of the MDW method, Korea Concrete Institute, pp. 1-36, 2017.
- H. G. Kim, Development of Prefabricated Voided-Slab Bridge Using PSC-I Girders, Journal of the Korea Academia-Industrial cooperation Society, Vol. 18, No. 6, pp. 742-752, 2017 DOI: http://dx.doi.org/10.5762/KAIS.2017.18.6.742