참고문헌
- AIA, AIA TAP BIM AWARDS, 2005-2016, http://www.aia.org/aia-architects (Dec. 24. 2018).
- Bae, K. J., Jun, H. J. (2010). A Study on Barriers to the Adoption of BIM and Change in Mind, Journal of Architectural Institude of Korea, 5(2), pp. 1-11.
- Barlish, K., Sullivan, K., (2012). How to Measure the Benefits of BIM-A Case Study Approach, Journal of Automation in Construction, 24, pp. 149-159. https://doi.org/10.1016/j.autcon.2012.02.008
- Bryde, D., Broquetas, M., Volm, J. M. (2013). The project benefits of building info rmation modelling (BIM). International journal of project management, 31(7), pp. 971-980. https://doi.org/10.1016/j.ijproman.2012.12.001
- Choi, J. H., Ryu, H. G. (2015). Application and Effects Analysis of BIM(Building Information Modeling) for Construction Management of a Construction Field, Journal of the Korea Institute of Building Construction, 15(1), pp. 115-121. https://doi.org/10.5345/JKIBC.2015.15.1.115
- Gugto Ilbo, 2016, BIM, cost reduction, air shortening effect 'excellent', http://www.ikld.kr (Feb, 22, 2019).
- Ham, N. H., Kim, J. J. (2015). A Case Study on BIM Operating and Performance Measurement in Construction Phase, Journal of KIBIM, 5(2), pp. 1-11. https://doi.org/10.13161/kibim.2015.5.2.001
- Jung, E. S., Kim, S. J., Ham, N. H., Moon, S. K., Kim, J. J., (2018). A Case Study on the Project Benefit of Digital Fabrication in Construction Projects, Journal of KIBIM, 8(2), pp. 29-40. https://doi.org/10.13161/KIBIM.2018.8.2.029
- Kim, H. J. (2010). The Study on the BIM Application Effect for Defect Prevention of Apartment Housing, Journal of Architectural Institude of Korea, 38(1), pp. 726-729.
- Kim, H. J. (2011). The Study on the BIM Application Effect for Defect Prevention of Apartment Housing, Masters Thesis, Dongeui University, pp. 1-74.
- Kim, H. J. (2017). A Correlation Analysis of Construction Elements through Case Analysis of Domestic and Foreign BIM Projects, Journal of KIBIM, pp. 2-12.
- Kim, J. H., Shin, M. H., Kim, C. H., Choi, Y. W., Han, S. C., Kim, H. Y. (2016). An Effectiveness Analysis of Building Information System (BIM) for Risk Management, Crisisonomy, 12(12), pp. 13-21.
- Kim, K. J. (2001). CM/PMBOK, Journal of Construction engineering and management, 2(3), pp. 109-113.
- Kim, Y. H., Jo, B. N., Kim, H. S., Kang, L. S. (2016). Development of Function Classification System for BIM Application by Construction Project Phases, Crisisonomy, pp. 400-401.
- Koh, S. H., Ham, N. H., Lee, J. S., Yoon, S. W., Kim, J. J. (2017). Comparison Analysis of BIM Level in the Domestic and Overseas BIM Projects - Focused on BIM Jornal and Award Winning Projects, Journal of KIBIM, 7, pp. 25-35. https://doi.org/10.13161/kibim.2017.7.2.025
- Lee, J. S. (2011). A Study on the Application of BIM to Architectural Field, Ssangyong Engineering, 60, pp. 30-38.
- Lee, J. Y. (2010). Korea Power Exchange (KPX) Project Case, The Bim, 4, pp. 27-29.
- Public Procurement Service, 2016, Expanding the application of custom service BIM, https://www.pps.go.kr (Feb. 20. 2019).
- Ryu, J. W. (2012). Digital Technologies for Freeform Building in Korea, Journal of the korea Academia Industrial cooperation Society, 13(9), pp. 4259-4265. https://doi.org/10.5762/KAIS.2012.13.9.4259
- Seo, H. C. (2018). Minimizing Risk in Early Stage of Construction using BIM, Journal of Architectural Institude of Korea, 38(1), pp. 726-729.