DOI QR코드

DOI QR Code

BIM을 이용한 건설프로젝트의 이점에 관한 사례 연구 - 국내 건축공사 사례를 중심으로 -

A Case Study on the Benefits of Construction Project with BIM - Focusing on Domestic Project -

  • 윤태환 (한양대학교 건축공학과) ;
  • 한만천 (한양대학교 건축공학과) ;
  • 함남혁 (한양사이버대학교 건축도시건설공학부 디지털건축도시공학과) ;
  • 김재준 (한양대학교 건축공학과)
  • 투고 : 2019.10.19
  • 심사 : 2019.10.19
  • 발행 : 2019.12.31

초록

As a result, the areas of knowledge that received the highest score in a positive impact were areas of risk management, while those that received the highest score in a negative impact were items of software management. In addition, each project was rated according to the score obtained. The distribution of grades by project was 71% for projects above middle grade and 29% for projects below middle grade. These results show that interest in BIM technology is increasing compared to the past, actual field application and research are actively being conducted, and that real construction sites also enjoy significant positive effects in terms of project management through BIM. In addition, the company is using BIM by applying advanced digital technologies such as AI technology, laser scanning technology and drone technology in line with the era of the fourth industrial revolution. Such a steady progress in future research on BIM technology development will reduce the number of low-grade projects and many middle-grade projects are expected to be upgraded to higher-level ones.

키워드

참고문헌

  1. AIA, AIA TAP BIM AWARDS, 2005-2016, http://www.aia.org/aia-architects (Dec. 24. 2018).
  2. Bae, K. J., Jun, H. J. (2010). A Study on Barriers to the Adoption of BIM and Change in Mind, Journal of Architectural Institude of Korea, 5(2), pp. 1-11.
  3. Barlish, K., Sullivan, K., (2012). How to Measure the Benefits of BIM-A Case Study Approach, Journal of Automation in Construction, 24, pp. 149-159. https://doi.org/10.1016/j.autcon.2012.02.008
  4. Bryde, D., Broquetas, M., Volm, J. M. (2013). The project benefits of building info rmation modelling (BIM). International journal of project management, 31(7), pp. 971-980. https://doi.org/10.1016/j.ijproman.2012.12.001
  5. Choi, J. H., Ryu, H. G. (2015). Application and Effects Analysis of BIM(Building Information Modeling) for Construction Management of a Construction Field, Journal of the Korea Institute of Building Construction, 15(1), pp. 115-121. https://doi.org/10.5345/JKIBC.2015.15.1.115
  6. Gugto Ilbo, 2016, BIM, cost reduction, air shortening effect 'excellent', http://www.ikld.kr (Feb, 22, 2019).
  7. Ham, N. H., Kim, J. J. (2015). A Case Study on BIM Operating and Performance Measurement in Construction Phase, Journal of KIBIM, 5(2), pp. 1-11. https://doi.org/10.13161/kibim.2015.5.2.001
  8. Jung, E. S., Kim, S. J., Ham, N. H., Moon, S. K., Kim, J. J., (2018). A Case Study on the Project Benefit of Digital Fabrication in Construction Projects, Journal of KIBIM, 8(2), pp. 29-40. https://doi.org/10.13161/KIBIM.2018.8.2.029
  9. Kim, H. J. (2010). The Study on the BIM Application Effect for Defect Prevention of Apartment Housing, Journal of Architectural Institude of Korea, 38(1), pp. 726-729.
  10. Kim, H. J. (2011). The Study on the BIM Application Effect for Defect Prevention of Apartment Housing, Masters Thesis, Dongeui University, pp. 1-74.
  11. Kim, H. J. (2017). A Correlation Analysis of Construction Elements through Case Analysis of Domestic and Foreign BIM Projects, Journal of KIBIM, pp. 2-12.
  12. Kim, J. H., Shin, M. H., Kim, C. H., Choi, Y. W., Han, S. C., Kim, H. Y. (2016). An Effectiveness Analysis of Building Information System (BIM) for Risk Management, Crisisonomy, 12(12), pp. 13-21.
  13. Kim, K. J. (2001). CM/PMBOK, Journal of Construction engineering and management, 2(3), pp. 109-113.
  14. Kim, Y. H., Jo, B. N., Kim, H. S., Kang, L. S. (2016). Development of Function Classification System for BIM Application by Construction Project Phases, Crisisonomy, pp. 400-401.
  15. Koh, S. H., Ham, N. H., Lee, J. S., Yoon, S. W., Kim, J. J. (2017). Comparison Analysis of BIM Level in the Domestic and Overseas BIM Projects - Focused on BIM Jornal and Award Winning Projects, Journal of KIBIM, 7, pp. 25-35. https://doi.org/10.13161/kibim.2017.7.2.025
  16. Lee, J. S. (2011). A Study on the Application of BIM to Architectural Field, Ssangyong Engineering, 60, pp. 30-38.
  17. Lee, J. Y. (2010). Korea Power Exchange (KPX) Project Case, The Bim, 4, pp. 27-29.
  18. Public Procurement Service, 2016, Expanding the application of custom service BIM, https://www.pps.go.kr (Feb. 20. 2019).
  19. Ryu, J. W. (2012). Digital Technologies for Freeform Building in Korea, Journal of the korea Academia Industrial cooperation Society, 13(9), pp. 4259-4265. https://doi.org/10.5762/KAIS.2012.13.9.4259
  20. Seo, H. C. (2018). Minimizing Risk in Early Stage of Construction using BIM, Journal of Architectural Institude of Korea, 38(1), pp. 726-729.