Development of modernizing Old Small-Hydropower system with custom-built at Overseas

해외 노후 수력발전시스템 수용가 맞춤형 현대화 기술개발 및 실증

  • Kim, Woonhak (Department of Civil, Safety, and Environmental Engineering, Hankyong National University) ;
  • Kang, Seokwon (Department of Civil, Safety, and Environmental Engineering, Hankyong National University) ;
  • Shin, Giseok (BOSUNG POWERTEC)
  • Received : 2018.05.27
  • Accepted : 2018.06.19
  • Published : 2018.06.30

Abstract

Purpose: The purpose of this study is to develop and demonstrate the customized modernization technology of the old aged hydropower generation system in operation Method: The modernization design was carried out based on the daily, weekly, monthly, and yearly information of the power plant in operation at the site. Results: In this paper, a safety diagnosis of existing facilities located in the Philippiness was carried out in accordance with the Special Act on the Safety Management of Domestic Facilities, and a method for reinforcing the facilities was selected. Conclusion: The selection of wheel suitable for the local environment and the maintenance of the old facilities were designed by domestic repair/reinforcement technology.

연구목적: 본 연구는 운용중인 해외 노후 수력발전 시스템 수용가 맞춤형 현대화 기술개발 및 실증이 그 목적이다. 연구방법: 현지에서 운용중인 발전소의 일간, 주간, 윌간, 년간 정보를 바탕으로 현대화 설계를 수행 하였다. 연구결과: 본 논문에서는 국내 시설물 안전관리에 관한 특별법에 의거 필리핀에 위치한 노후 수력발전소의 현대화를 위해 최초 기존 시설물에 대한 안전진단을 실시하여 토목 및 건축물의 보강을 위한 방법을 선정하였다. 결론: 현지 환경에 적합한 수차선정과 노후 시설물의 유지보수를 국내 토목 보수 보강 기술로 설계하였다.

Keywords

References

  1. Taehwang Chung(2015) "Security Improvement Plan for Nationwide Key Energy Facilities" Journal of the Korea Society of Disaster Information, Vol 11 No 2, P263-267 https://doi.org/10.15683/kosdi.2015.11.2.263
  2. J. S. Kim ,H. C. Kwon (2009)"Development and Application of the Methodology to Establish Life Extension and Modernization Plan of Aged Hydropower Plants" Transactions of the Korean Society of Mechanical Engineers A, Vol 33 No 10 P1171-1176 https://doi.org/10.3795/KSME-A.2009.33.10.1171
  3. Operating and Maintenance Instructions Ton-ok, Republic of the Philippins National Electrification Administration, Volume I, June 1982
  4. HAP, "Condition Assessment Manual", Pelton Turbine Inspection Form and Check List,Revision 1.0, PP214-423, 12-8-2011
  5. Ahmed M.A.Haidar(2011) "Feasibility Study of Microgrid Application in Langkawi and Socotra Islands" ICITA 2011 P228-232
  6. EPRI , 1999 , Hydro Life Extension Modernization Guide