DOI QR코드

DOI QR Code

Pre-construction Simulation of Precast Bridge Piers and Quality Management using Augmented Reality

증강현실 기반의 프리캐스트 교각의 사전시공 시뮬레이션 및 시공성 정밀도 관리방안

  • Received : 2018.01.18
  • Accepted : 2018.02.27
  • Published : 2018.03.31

Abstract

Geometry control of precast members is the most important technology for modular construction. In this paper, image-based modeling and rendering (IBMR) technology was adopted for 3D modeling of precast elements. It is necessary to use match-casting method for precast post-tensioned column assembly. Preassembly using 3D models created by image processing can minimize construction error. Augmented reality devices are used to check the geometry of the segment. Laboratory-scale tests were performed. The proposed process has been applied to the real precast bridge pier segments.

Keywords

References

  1. Deseilligny, M. P., Clery, I. (2011). Apero, an open source bundle adjusment software for automatic calibration and orientation of set of images, In Proceedings of the ISPRS Symposium, 16(5), pp. 269-276.
  2. El-Hakim, S. F., Beraldin, J. A., Picard, M., Godin, G. (2004). Detailed 3D reconstruction of large-scale heritage sites with integrated techniques, IEEE Computer Graphics and Applications, 24(3), pp. 21-29. https://doi.org/10.1109/MCG.2004.1318815
  3. General Services Administration. (2016). BIM Guide for 3D imaging.
  4. Haala, N., Kada, M. (2010). An update on automatic 3D building reconstruction, ISPRS Journal of Photogrammetry and Remote Sensing, 65(6), pp. 570-580. https://doi.org/10.1016/j.isprsjprs.2010.09.006
  5. Jeong, D. G., Kim, D. W., Shim, C. S. (2012). Development of 3D Information Models for Modular Bridges, Journal of Korea BIM Institute 2012, pp. 123-125.
  6. Kang, J. I., Lee, I. P. (2016). Indoor 3D Modeling Using a Rotating Stereo Frame Camera System and Accuracy Evaluation, KOREAN JOURNAL OF REMOTE SENSING, 32(5), pp. 511-527. https://doi.org/10.7780/kjrs.2016.32.5.9
  7. Kim, D. W., Chung, D. K., Shim, C. S. (2012). Development of 3D Parametric Models for Modular Bridge Substructures, Journal of KIBIM, 2(2), pp. 37-45.
  8. Kim, J. K. (2017), Optimal Operation of 3D Modeling on IBMR Environment, Communication Design Association of Korea, 59, pp. 21-31.
  9. Lee, J. C., Moon, D. Y., Kim, N. S., Seo, D. J. (2005). Accurate Reconstruction Data of Cultural Heritages With the Combined Digital Photogrammetry / 3D Laser Scanner, korean society of civil engineers conference 2005, pp. 5144-5147.
  10. Lee, S., Park, S., Dang, N. S., Shim, C. S. (2015). 3D digital fabrication and erection technologies for prefabricates bridges. Building Information Modeling (BIM) in Design, Construction and Operations, 149, pp. 3-8.
  11. Mayer, H. (1999). Automatic object extraction from aerial imagery-a survey focusing on buildings, Computer vision and image understanding, 74(2), pp. 138-149. https://doi.org/10.1006/cviu.1999.0750
  12. Olsson, C., Enqvist, O. (2011). Stable structure from motion for unordered image collections, In Scandinavian Conference on Image Analysis, Springer Berlin Heidelberg, pp. 524-535.
  13. Park, S. J., Shim, C. S. (2014). Intelligent Design and Rapid Construction Technologies for Bridge Pier, Journal of Korea Concrete Institute 2014, pp. 921-922.
  14. Park, S. J., Shim, C. S. (2017). Image Processing Schema for Evaluation of Matchcasting of Prefabricated Columns, Jounal of Korea Concrete Institute 2017, 29(2) pp. 431-432.
  15. Pierrot-Deseilligny, M., Paparoditis, N. (2006). A multiresolution and optimization-based image matching approach: An application to surface reconstruction from SPOT5-HRS stereo imagery, Archives of Photogrammetry, Remote Sensing and Spatial Information Sciences, 36(41).
  16. Remondino, F., El‐Hakim, S. (2006). Image‐based 3D modelling: A review, The Photogrammetric Record, 21(115), pp. 269-291. https://doi.org/10.1111/j.1477-9730.2006.00383.x
  17. Shim, C. S., Park, S. J., Lee, S. Y., Dang, N. S. (2014). Pre-construction Simulation of Precast Bridge Piers and Quality Management Method based on AR and VR, National Accelerated Bridge Construction Conference.
  18. Shim, C. S., Park, S. J., Song, H. H., Lee, S. Y. (2014). 3D Knowledge Embedded Engineering on Prefabricated Bridge Substructures, Istanbul Bridge Conference.
  19. Soontranon, N., Srestasathiern, P., Lawawirojwong, S. (2015). 3D Modeling from Multi-views Images for Cultural Heritage in Wat-Pho, Thailand, The International Archives of Photogrammetry, Remote Sensing and Spatial Information Sciences, 40(5), pp. 403-404.
  20. Wu, C. (2013). Towards linear-time incremental structurefrom motion, 3DTV-Conference 2013 InternationalConference on pp. 127-134.