DOI QR코드

DOI QR Code

Analysis of BIM Impact on Preventing Rework in Construction Phase

시공단계 BIM 적용에 의한 재시공 방지 효과분석

  • Lee, Myung-Do (R&D Institute, Yunwoo Technologies Co., Ltd.) ;
  • Cha, Min-Su (R&D Institute, Yunwoo Technologies Co., Ltd.) ;
  • Lee, Ung-Kyun (Dept. of Architectural Engineering, Catholic Kwandong University)
  • Received : 2018.02.22
  • Accepted : 2018.03.13
  • Published : 2018.04.20

Abstract

The purpose of this study is to analyze the effects of applying BIM to the construction phase on preventing rework. Previous studies have presented the contribution of BIM in various ways, but a more practical and reliable analysis methodology are required. In this study, a BIM effect analysis methodology was proposed after collecting requirements on BIM effect analysis from field professionals. In the case study, the rework prevention effect was analyzed based on the proposed methodology. As a result, it was found that BIM application produced the rework prevention effect of approximately KRW 370,519,593. In addition, a consultation with field professionals on the suitability of the proposed methodology and effect analysis results were revealed that the results were sufficiently reliable. The results of this study can be used as efficient basic materials for research on BIM performance measurement in the future.

본 연구는 시공단계에 적용된 BIM이 재시공 방지에 기여한 효과를 분석하는 것을 목적으로 하였다. 기존 연구에서는 다양한 방법으로 BIM에 대한 적용효과를 제시하고 있으나 보다 현실적이고 신뢰성 있는 분석 방법론이 요구되고 있다. 이에 본 연구에서는 현장 실무자를 대상으로 BIM 효과분석에 대한 요구사항을 수집하고, 이를 반영한 BIM 효과분석 방법론을 제시하였다. 사례 연구를 통해 제시한 방법론을 기반으로 재시공 방지 효과를 분석하였다. 사례현장에서는 BIM 적용을 통해 약 370,519,593원의 재시공 방지 효과가 있는 것으로 분석되었다. 또한 현장 실무진을 대상으로 본 연구에서 제시한 방법론 및 효과분석 결과에 대한 적합성을 자문하였으며 충분한 신뢰성이 있는 결과인 것으로 확인하였다. 본 연구의 결과물은 향후 BIM 성과측정 연구에 효율적인 기초자료로 활용될 수 있을 것이다.

Keywords

References

  1. Azhar S. Building information modeling(BIM): trends, benefits, risks, and challenges for the AEC industry. Leadership and Management in Engineering. 2011 Jul;11(3):241-52. https://doi.org/10.1061/(ASCE)LM.1943-5630.0000127
  2. Giel B, Issa RRA, Olbina S. Return on investment analysis of building information modeling in construction. In: Tizani W, editors. Proceedings of the International Conference on Computing in Civil and Building Engineering; 2010 Jun 30-Jul 2; Nottingham, UK. Nottingham (UK): Nottingham University Press; 2010. p. 153-8.
  3. Lee G, Park KH, Won JS. D3 city project: Economic impact of BIM-assisted design validation. Automation in Construction. 2012 Mar;22:577-86. https://doi.org/10.1016/j.autcon.2011.12.003
  4. Barlish K, Sullivan K. How to measure the benefits of BIM: a case study approach. Automation in Construction. 2012 Jul;24:149-59. https://doi.org/10.1016/j.autcon.2012.02.008
  5. Sacks R, Eastman CM, Lee G, Orndorff D. A target benchmark of the impact of tree-dimensional parametric modeling in precast construction. Journal of the Precast/Prestressed Concrete Institute. 2005 Jul;50(4):126-39.
  6. Kuprenas JA, Mock CS. Collaborative BIM modeling case study: process and results. In: Caldas CH, O'Brien WJ, editors. Proceedings of the 2009 ASCE International Workshop on Computing in Civil Engineering; 2009 Jun 24-27; Austin, TX. Reston (VA): ASCE Press; p. 431-41.
  7. Jun KH, Yun SH. Performance measurement method and case study for BIM based construction simulation system. Korea Journal of Construction engineering and Management. 2013 Jul;14(4):15-23. https://doi.org/10.6106/KJCEM.2013.14.4.015
  8. Kim EJ, Kim JH, Huh YK. A case study on practical using of BIM in building construction, Journal of the Architectural Institute of Korea Structure and Construction. 2016 Dec;32(12):69-75. https://doi.org/10.5659/JAIK_SC.2016.32.12.69
  9. Kim HJ, Yoo MY, Kim JJ, Choi CS. Performance analysis of BIM labor using case analysis. Journal of Korean Institute of Building Information Modeling. 2017 Sep;7(3):31-9.
  10. Park CS, Park HT. Improving constructability analysis tasks by applying BIM technology. Korea Journal of Construction engineering and Management. 2013 Mar;11(2):137-46. https://doi.org/10.6106/KJCEM.2010.11.2.137
  11. Lee SI, Kwon NH, Cho YS. A Case study of BIM-based framework on constructability tasks. Journal of the Korea Institute on Building Construction. 2010 Oct;10(5):45-54. https://doi.org/10.5345/JKIC.2010.10.5.045
  12. Lee JG, Lee HS, Park MS, Kim SY. Selecting quantifiable indicators for evaluating BIM-based design collaboration performance. Journal of the Architectural Institute of Korea Planning and Design. 216 Oct;32(10):35-43. https://doi.org/10.5659/JAIK_PD.2016.32.10.35
  13. Sacks R, Barak R. Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice. Automation in Construction. 2008 May;17(4):439-49. https://doi.org/10.1016/j.autcon.2007.08.003