Fig. 1. Schematic diagram for the calculation of Total Capital Investment and Total Revenue Requirement
Fig. 2. Cashflow for levelization of Total Revenue Requirement
Fig. 3. Methodology to estimate LCOE calculated by Economic analysis program
Fig. 4. Architecture of ‘Calculate levelized cost of electricity’ (Level 2)
Fig. 5 Architecture of ‘Calculate levelized cost of electricity’ (Level 4)
Fig. 6. The comparison results of NGCC cases
Fig. 7. The comparison results of IGCC cases
Fig. 8. Comparison of levelization methods (NGCC B31A)
Fig. 9. The comparison results of NGCC cases using NETL levelization method
Fig. 10. The comparison results of IGCC cases using NETL levelization method
Table 1. Cost Estimate Classification Matrix for Process Industries [18]
Table 2. NETL Cases Descriptions
Table 3. Economic index input summary (NGCC B31A case)
Table 4. Financial structure for NGCC and IGCC cases
References
- Forman, C., Ibrahim K. M., Robert P., and Bernd M., 2016, Estimating the global waste heat potential, Renewable and Sustainable Energy Reviews, Vol. 57, pp. 1568-1579 https://doi.org/10.1016/j.rser.2015.12.192
- Korea Energy Economics Institute, 2016, Energy Info. Korea 2016
- Ki, J. Y., 2017, Engineering Technique for Power Generation System Design using Industry Waste Heat, KEIT PD Issue Report, Vol 17-6
- Wittenstein, M., 2015, Projected Costs of Generating Electricity, IEA, NEA
- NETL, 2015, Cost and performance baseline for fossil energy plants volume 1a: bituminous coal(PC) and natural gas to electricity revision 3, Depart of Energy, DOE/NETL-2015/1723
- NETL, 2015, Cost and performance baseline for fossil energy plants volume 1b: bituminous coal (IGCC) to electricity revision 2, U. S. Depart of Energy, DOE/NETL-2015/1727
- NETL, 2011, Cost and performance baseline for fossil energy plants volume 3a: low rank coal to electricity : IGCC cases, U.S. Depart of Energy, DOE/NETL-2010/1399
- NETL, 2011, Cost and performance baseline for fossil energy plants volume 3c: natural gas combined cycle at elevation, U. S. Depart of Energy, DOE/NETL-2010/1396
- NETL, 2011, Quality guidelines for energy system studies: cost estimation methodology for NETL assessments of power plant performance, Depart of Energy, DOE/NETL-2014/1653
- NERL, 2018, 2018 Annual Technology Baseline, http://www.nrel.gov/analysis/data_tech_baseline.html
- Sayyaadi, H.,Saffari A., 2010, Thermoeconomic optimization of multi effect distillation desalination systems, Applied Energy, Vol. 87, pp. 1122-1133 https://doi.org/10.1016/j.apenergy.2009.05.023
- Bejan, A., Tsatsaronis, G., Moran, M., 1996, Thermal Design and Optimization, John Wiley, New-York
- AACE International, 2018, Cost Engineering Terminology, No. 10S-90
- Booras, G., Lyons, C., Nguyen, B., 2015, Power Generation Technology Data for Integrated Resource Plan of South Africa, EPRI, pp. 5-2
- Kim, J. Y., 2017, Development of total capital investment estimation module for power generation system using industrial waste heat, Journal of the Korea Society of Systems Enginering, Vol.13, No.2
- Depart of Defense, 2001, System Engineering Fundamentals, VA : Defense Aquisition University
- Smith, G., 2011, DOE-STD-3024-2011: Content of System Design Descritpions, U.S. Department of Energy
- AACE International, 2011, Cost Estimate Classification System - As Applied in Engineering, Procurement, and Construction for the Process Industries, AACE International Recommended