A Study for Selecting the Plant Project Risk Management Check List

플랜트 PRM (Project Risk Management) 체크리스트 항목 선정을 위한 연구

  • Choi, Doo-hoi (Department of Architectural Engineering, Chungbuk University) ;
  • Bang, Hong-soon (Department of Architectural Engineering, Chungbuk University) ;
  • Lee, Tae-hyeong (Department of Architectural Engineering, Chungbuk University) ;
  • Kim, Ok-kyue (Department of Architectural Engineering, Chungbuk University)
  • Received : 2017.07.05
  • Accepted : 2017.12.14
  • Published : 2018.01.31

Abstract

Currently, as construction businesses develop and diversity, risk became one of the most crucial considerations. Risks are potential and difficult to predict by nature. Also, they are important as they influence delay in construction period and increase of project costs. In construction projects in South Korea and elsewhere, the importance of risk management widely recognized and relevant research is being conducted continuously. The companies use PRM checklist but apply different criteria and items. For efficient risk management in plants, plant PRM checklist is necessary. This study analyzed risk factors that are taken into account in construction projects and proposed a plant PRM checklist based on case analysis and opinions of experts. Also, it rated the frequency and importance of each risk.

현재 건설사업의 발전으로 다양화가 되면서 관심을 가져야 할 분야 중 하나가 리스크이다. 리스크란 잠재적인 성격을 가지고 있으며 예측하기가 어렵다. 또한, 사업기간지연, 사업비 등 사업의 성패를 좌우할 만큼의 중요한 요인이다. 국내 외 건설사업에서 리스크 관리의 중요성을 인지하여 리스크에 관한 기법, 분석 등으로 연구가 지속되고 있다. 각 회사에서는 리스크 관리를 위해 PRM 체크리스트를 사용하는데, 기준과 항목이 각 건설사별로 다르다. 플랜트의 원활한 리스크 관리를 위해서 플랜트 PRM 체크리스트가 필요하다. 따라서 본 연구에서는 건설사업에서 고려되는 위험요인을 분석하고, 리스크의 사전대비를 위하여 리스크 관련 사례분석과 전문가들의 의견을 종합하여 플랜트 PRM체크리스트를 제안하였다. 그리고 발생빈도 및 중요도를 점수로 나타내서 각 리스크 요인별로 중요도를 보여주었다.

Keywords

References

  1. Ahn, S. H. (2015). "A case study of the risk identification in construction project." Korean Journal of Construction Engineering and Management, KICEM, 16(1), pp. 15-23. https://doi.org/10.6106/KJCEM.2015.16.1.015
  2. An, C. H. (2012). "A Decision Support Model for the Exchange Risk Management of Overseas Construction Project." Inha University Master's Thesis.
  3. Bae, G. C. (2012). "An Analysis of the Importance of Risk Factors for Construction Project in North Korea-Base don Kae song In dustrial Complex." Hanyang University Master's Thesis.
  4. Bang, H. S., Kim, J. K., Choi, B. J., and Kim, O. K. (2017). "A Basic Study for Selecting the Project Risk Management Check List." Journal of the Korean Institute of Building Construction, 17(1), pp. 99-100.
  5. Choi, G. H. (2012). "Impact Analysis of Risk Factors on Performance in Overseas Construction - Focused on the Construction Cost, Construction Period, and Construction Quality -." Dongguk University Master's Thesis.
  6. Go, Y. H. (2010). "Risk Management Improvements based on Small-Size Construction Case Studies of Small/Medieum Sized Construction Compainies." Chung-Ang University Master's Thesis.
  7. Jang, W. S., Park, H. D., Jung, W. Y., and Han, S. H. (2009). "A Preliminary Study for Risk Management System Development in Overseas Plants Construction Projects." Proceedings of KICEM Annual Conference, KICEM, 9, pp. 863-868.
  8. Jang, W. S., Hong, H. W., and Han, S. H. (2011). "Risk Identification and Priority method for Overseas LNG Plant Projects - Focusing on Design Phase -" Korean Journal of Construction Engineering and Management, KICEM, 12(5), pp. 146-154. https://doi.org/10.6106/KJCEM.2011.12.5.146
  9. Jeong, J. H. (2012). "Establishment of contingency estimation system according to analysis about cost overrun risk of public construction project." Dong-A University doctoral thesis.
  10. Kang, H. Y., Kim, M. S., Kim, S. H., and Kim, Y. S. (2012) " A Study on the Analysis of Risk Factors in Engineering, Procurement and Construction Phase for Overseas Plant Project." The Architectural Institute of Korea. 28(5) pp. 111-118.
  11. Kim, M. (2014). "Risk process and management system gap in power plant overseas construction." Myongji University Master's thesis.
  12. Lee, D. L. (2010). "Developing techniques for risk analysis and management of construction projects." Chungnam National University Master's Thesis.
  13. Lee, T. W. (2014). "Research on the Importance and the Impacts of Risk Factors for Project Performance in Construction Industry." Hanyang University Master's Thesis.
  14. Oh, G. L. (2012). "Analysis and Response of Risk Factors in A Turn Key Construction Contract." Pukyong National University doctoral thesis.
  15. Pack, G. T. (2014). "Comparative Study on Construction Contracting Method for Mineral Resource Development Stag." Hanyang University Master's Thesis.
  16. Pack, H. T., Song, C. B., and Kang, I. S. (2000). "Improvement of construction process control to reduce construction risk." Korean Journal of Construction Engineering and Management, KICEM, 1(1), pp. 35-44.
  17. Pack, J. C. (2016). "Study of Risk Analysis for Bidding of Overseas Project According to Contract Condition." Hanyang University Master's Thesis.
  18. Seo, Y. C. (2009). "${\circ}{\circ}$ system construction business risk management application example." Korean Journal of Construction Engineering and Management, KICEM, 10(4), pp. 29-32.
  19. Seo, J. P. (2011). "Evaluation of Impact Assessment of the Cost Risk-Factor for the Design - Build Projects Based on FMEA." Soongsil University Master's thesis.
  20. Woo, K. M., and Lee, H. K. (2005). "A study of the Risk Management on the Apartment Reconstruction Projects." Journal of the Architectural Institute of Korea, 21(12), pp. 175-182.
  21. Yun, D. H. (2014). "An Assesment & Analysis of Risk Based on Accident Category for Container Terminals." Korea Shipping Logistics Association, 30(4), pp. 843-858.