References
- Ahn, S. H. (2015). "A case study of the risk identification in construction project." Korean Journal of Construction Engineering and Management, KICEM, 16(1), pp. 15-23. https://doi.org/10.6106/KJCEM.2015.16.1.015
- An, C. H. (2012). "A Decision Support Model for the Exchange Risk Management of Overseas Construction Project." Inha University Master's Thesis.
- Bae, G. C. (2012). "An Analysis of the Importance of Risk Factors for Construction Project in North Korea-Base don Kae song In dustrial Complex." Hanyang University Master's Thesis.
- Bang, H. S., Kim, J. K., Choi, B. J., and Kim, O. K. (2017). "A Basic Study for Selecting the Project Risk Management Check List." Journal of the Korean Institute of Building Construction, 17(1), pp. 99-100.
- Choi, G. H. (2012). "Impact Analysis of Risk Factors on Performance in Overseas Construction - Focused on the Construction Cost, Construction Period, and Construction Quality -." Dongguk University Master's Thesis.
- Go, Y. H. (2010). "Risk Management Improvements based on Small-Size Construction Case Studies of Small/Medieum Sized Construction Compainies." Chung-Ang University Master's Thesis.
- Jang, W. S., Park, H. D., Jung, W. Y., and Han, S. H. (2009). "A Preliminary Study for Risk Management System Development in Overseas Plants Construction Projects." Proceedings of KICEM Annual Conference, KICEM, 9, pp. 863-868.
- Jang, W. S., Hong, H. W., and Han, S. H. (2011). "Risk Identification and Priority method for Overseas LNG Plant Projects - Focusing on Design Phase -" Korean Journal of Construction Engineering and Management, KICEM, 12(5), pp. 146-154. https://doi.org/10.6106/KJCEM.2011.12.5.146
- Jeong, J. H. (2012). "Establishment of contingency estimation system according to analysis about cost overrun risk of public construction project." Dong-A University doctoral thesis.
- Kang, H. Y., Kim, M. S., Kim, S. H., and Kim, Y. S. (2012) " A Study on the Analysis of Risk Factors in Engineering, Procurement and Construction Phase for Overseas Plant Project." The Architectural Institute of Korea. 28(5) pp. 111-118.
- Kim, M. (2014). "Risk process and management system gap in power plant overseas construction." Myongji University Master's thesis.
- Lee, D. L. (2010). "Developing techniques for risk analysis and management of construction projects." Chungnam National University Master's Thesis.
- Lee, T. W. (2014). "Research on the Importance and the Impacts of Risk Factors for Project Performance in Construction Industry." Hanyang University Master's Thesis.
- Oh, G. L. (2012). "Analysis and Response of Risk Factors in A Turn Key Construction Contract." Pukyong National University doctoral thesis.
- Pack, G. T. (2014). "Comparative Study on Construction Contracting Method for Mineral Resource Development Stag." Hanyang University Master's Thesis.
- Pack, H. T., Song, C. B., and Kang, I. S. (2000). "Improvement of construction process control to reduce construction risk." Korean Journal of Construction Engineering and Management, KICEM, 1(1), pp. 35-44.
- Pack, J. C. (2016). "Study of Risk Analysis for Bidding of Overseas Project According to Contract Condition." Hanyang University Master's Thesis.
-
Seo, Y. C. (2009). "
${\circ}{\circ}$ system construction business risk management application example." Korean Journal of Construction Engineering and Management, KICEM, 10(4), pp. 29-32. - Seo, J. P. (2011). "Evaluation of Impact Assessment of the Cost Risk-Factor for the Design - Build Projects Based on FMEA." Soongsil University Master's thesis.
- Woo, K. M., and Lee, H. K. (2005). "A study of the Risk Management on the Apartment Reconstruction Projects." Journal of the Architectural Institute of Korea, 21(12), pp. 175-182.
- Yun, D. H. (2014). "An Assesment & Analysis of Risk Based on Accident Category for Container Terminals." Korea Shipping Logistics Association, 30(4), pp. 843-858.