Abstract
Over the past 30 years, the business effects of the improvement project at black spot have been decreasing since 2010, with a reduction in the amount of government spending, coupled with proposing a uniform improvement plan. In order to promote more efficient improvement projects, it is necessary to evaluate the efficiency of local governments and improve the business methods of local governments with low efficiency. However, more sophisticated efficiency analysis methods are needed. Because in previous studies have been limited to the analysis of effects before and after the project through the simple before-after analysis. For this purpose, this study analyzed the efficiency of improvement project at black spot by local governments in Gyeonggi-do using DEA to compare and analyze efficiency in various fields. As a result, Goyang, Seongnam, Paju, Hanam and Yangju showed high efficiency local governments. For local governmetns with low efficiency, the improvement projets to improve efficiency were divided into civil engineering work, structure work, pavement work, additional work and transportation work, and the appropriate construction ratios of each local government were analyzed and presented.