References
- Choi, S. I. (1997), A conceptual cost estimating process for building construction projects, Masters thesis, Chung Ang University, pp. 5-18.
- Han, N. H., Kim, J. J. (2015). A Case Study on BIM Operating and Performance Measurement in Construction Phase, Journal of KIBIM Magazine, 5(2), pp. 1-11.
- Joo, S. I., Jun, H. J. (2009) A Study on the BIM-basd Material Take Off That is Usable as 4D Simulation, Journal of the Architectural institute of Korea, 29(1), pp. 335-338.
- Kang, M. K. (2008). A Method of Cost, Breakdown, Process, Progress Unified Management based on BIM, masters Thesis, Sung Kyun Kwan University, pp. 8-20.
- Kim, B. M., Jeon, H. J., Jang, S. J., Yun, S. H., Paek, J. H. (2008) A study on the Improving Effectiveness of Quantity Estimation with BIM, Journal of the Architectural institute of Korea, 28(1), pp. 705-708.
- Kim, K. H., Park, C. S., Chang, S. H. (2005). web-Based Cost Planning Program for High-Rise Office Building, Journal of Korea Institute Construction Engineering and Management, 6(2), pp. 69-79.
- Kwon, O. B., Son, J. H., Lee, S.H. (2009). Study on Applicationo 3D - based BIM for School Facilities to Increase Cost Management Efficiency. Journal of the Korea Institute of Building Construction, 10(6), pp. 49-60. https://doi.org/10.5345/JKIC.2010.12.6.049
- Lee, C. H., Kim, S. A., Chin, S. Y. (2011). An Index for Measuring the Degree of Completeness of BIM-based Quantity Take-Off, Journal of Korea Institute Construction Engineering and Management, 12(6), pp. 79-92.
- Lee, J. H. (2010). A Case Study on the Detailed Estimation using BIM, Masters Thesis, Chung Ang University, pp. 35-37.
- Lee, M. C. (2008). A Study on the BIM Property Information Modeling for the Cost Estimate of the Public Construction Projects, Masters Thesis, Housing Seoul National University of technology, pp. 4-16.
- Li, Q., Tian, Z. (2014). Construction project cost management under the mode of bill of quantities, Proceedings of the 17th International Symposium on Advancement of Construction Management and Real Estate, pp. 769-780.
- Lim, D. H., Lee, H. S., Park, M. S., Son, B. S. (2008). Analyzing the Schematic Cost Estimating Model Based on Quantity Variation in Building Projects Using the Case Study - Applying to Structure Cost of Residential Complex Building Project -, Journal of the Architectural institute of Korea, 24(6), pp. 109-118.
- Noh, H. R. (2017). A Case Study on the Educational Facility Project for the Improvement of BoQ Information Structure, pp. 181-190.
- Park, S. M. (2003). study on the application of estimation method of historical cost data for estimating the proper construction cost, Masters thesis, Yonsei University, pp. 24.
- Park, Y. J., Won, S. K., Han, C. H., Lee, J. B. (2011). A Study on 3D BIM Collaborative Approximate Estimating Model of Structural Work for Apartment Projects, Journal of the Architectural institute of Korea, 27(6), pp. 123-130.
- Sim, H. W. (2012). A Study on The Usability of a BIM-based Integration Solution to The Preliminary Estimate of the Public Sonstruction Projects, Masters Thesis, Seoul National University of Science and Technology, pp. 5-6.
- Suh, B. G. (2014). A study on way to build combination DB of the building element types for BIM based preliminary estimate. Masters Thesis, Gyeongsang National University, pp. 1-15.
- Yoo, M. K. (2008). A study on Improving Estimating practices of Building Projects Using BIM, Masters thesis, Chung Ang University, pp. 16-18.
Cited by
- 철근 수량산출 간소화 방안 vol.19, pp.6, 2017, https://doi.org/10.5345/jkibc.2019.19.6.521
- BIM기반 철근콘크리트구조의 물량산출 비교 vol.33, pp.1, 2017, https://doi.org/10.7734/coseik.2020.33.1.35
- 공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안 vol.11, pp.2, 2017, https://doi.org/10.13161/kibim.2021.11.2.001
- 공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안 vol.11, pp.2, 2017, https://doi.org/10.13161/kibim.2021.11.2.001