Abstract

Building information modeling (BIM) can improve to communicate with project participants by early construction involvement (ECI) from the beginning of the project. Therefore, they can minimize design changes and improve design quality and construction. However, because there is insufficient research on the scope and application level of BIM according to project delivery system and project characteristics, construction companies have efficiently not been using the BIM. Therefore, this study intends to conduct basic research as a basis for confirming appropriate BIM application and level according to project delivery system and project characteristics. To do this, we investigated the project delivery system and project characteristics of domestic and foreign projects that have successfully applied BIM, and compare and analyze them based on BIM application and BIM level framework derived from theory reviews and experts. Therefore, this study can be used as a basis for strategically establishing the scope and level of BIM according to project delivery system and project characteristics through the result of this study.

Keywords

References

  1. AIA, AIA TAP BIM AWARDS, 2005- 2016, http://www.aia.org/aia-architects (Oct, 05, 2016)
  2. AIA California Council, Integrated Project Deliver: A Guide 2007 version 1, 2007.
  3. AIA, AIA Document E202TM-2008, 2008, http://www.durhamnc.gov/agendas_new/2015/cm20150302/10290_CONTRACT_E202_CONTRACT_ATTACHMENT__365760_627078.PDF, (Feb, 12, 2017)
  4. Autodesk BIM Awards, 2014, http://www.autodeskbimaward. com/winnders.jsp (Oct, 21, 2016)
  5. Bedrick, J. (2008). Organizing the Development of a Building Information Model, The American Institute of Architects, 9.
  6. BIM in Practice, 2013, pp. 162-172.
  7. Bryde, D., Broquetas, M., Volm, J. M. (2013). The Project Benefits of Building Information Modeling (BIM), International Journal of Project Management, 31(7), pp. 971-980. https://doi.org/10.1016/j.ijproman.2012.12.001
  8. BuildingSmart Korea BIM Award Gallery, 2005-2015, http://www. buildingsmart.or.kr/Awards/Gallery/Gallery.aspx?select=102 &idx=5, (Sep, 02, 2016)
  9. BuildingSmart Korea, The BIM spring 2009, Vol. 2, pp. 26-31.
  10. BuildingSmart Korea, The BIM winter 2009-2010, Vol. 3, pp. 24-36.
  11. BuildingSmart Korea, The BIM autumn 2010, Vol. 4, pp. 27-29.
  12. BuildingSmart Korea, The BIM summer 2011, Vol. 5, pp. 30-32., 37-39.
  13. BuildingSmart Korea, The BIM summer 2012, Vol. 6, pp. 36-37.
  14. BuildingSmart Korea, The BIM winter 2012, Vol. 7, pp. 38-40., 44-47.
  15. BuildingSmart Korea, The BIM winter 2013, Vol. 10, pp. 12-17., 20-22., 25-29., 32-33.
  16. BuildingSmart Korea, The BIM winter 2014, Vol. 12, pp. 32-33., 38-41.
  17. BuildingSmart Korea, The BIM winter 2014, Vol. 12, pp. 48-51.
  18. BuildingSmart Korea, The BIM spring 2015, Vol. 13, pp. 28-31.
  19. BuildingSmart Korea, The BIM winter 2015, Vol. 14, pp. 24-27.
  20. Cho, S., Cho, Y., Lee, K. H., Paek, J. H. (2009). Application of BIM in Public Construction Project : Focused on Delivery System, The Korea Institute of Building Construction, 15(4), pp. 93-99.
  21. Cho, H. J., Kim, Y. S., Ma, Y. K. (2013). A Study of LOD(Level of Detail) for BIM Model Applied the Design Process, Journal of KIBIM, 3(1), pp. 1-10. https://doi.org/10.13161/KIBIM.2013.3.1.001
  22. Computer Integrated Construction Research Program. "BIM Project Execution Planning Guide - Version 2.1." May, The Pennsylvania State University, University Park, PA, USA., 2011.
  23. Fallon, K. K., Palmer, M. E. (2008). General Buildings Information Handover Quide, Principles, Methodology and Case Studies (NISTIR 7417), August.
  24. Halttula, H., Aapaoja, A., Haapasalo, H. (2015). The Contemporaneous Use of Building Information Modeling and Relational Project Delivery Arrangements, Procedia Economics and Finance, 21, pp. 532-539. https://doi.org/10.1016/S2212-5671(15)00209-9
  25. Hergunsel, M. F. (2011). Benefits of Building Information Modeling for Construction Managers and BIM based Scheduling, Diss. Worcester Polytechnic Institute, pp. 1-95.
  26. Jang, C. G., Lee, B. N., Choi, S. I., Lee, D. G. (2006). Understanding CM at Risk and Diagnose Introduction Possibility, Construction Economy Research Institute of Korea, 2006(5), pp. 1-130.
  27. Jang, M. W., Shim, U. J., Ahn, Y. S. (2013). A Study on the Solution of Focused Restraints for Introduction of IPD for BIM Efficient Utilization in Domestic Construction Industry, The Korea Institute of Building Construction, 9(1), pp. 203-207.
  28. Jo, Y. H., Lee, J. S., H, N. H. (2016). BIM Strategy Plan through Domestic Construction Companies BIM Project Case Analysis ; foucsed on the BIM Use of the project from 2009 to 2015, Journal of KIBIM, 6(2), pp. 1-11. https://doi.org/10.13161/KIBIM.2016.6.2.001
  29. KIBIM Magazine, Vol. 1 First Issue spring 2011, Vol. 1, pp. 24-26.
  30. KIBIM Magazine, Vol. 1 Second Issue winter 2011, Vol. 1, pp. 52-60., 66-71.
  31. KIBIM Magazine, Vol. 3 First Issue spring 2013, Vol. 3, pp. 34-37.
  32. KIBIM Magazine, Vol.3 Second Issue summer 2013, Vol. 3, pp. 32-37.
  33. KIBIM Magazine, Vol.3 Third Issue autumn 2013, Vol. 3, pp. 19-23.
  34. KIBIM Magazine, Vol. 3 Fourth Issue winter 2013, Vol. 3, pp. 20-26., 38-43.
  35. KIBIM Magazine, Vol. 4 First Issue spring 2014, Vol. 4, pp. 48-63.
  36. KIBIM Magazine, Vol. 4 Second Issue summer 2014, Vol. 4, pp. 36-42.
  37. KIBIM Magazine, Vol.4 Fourth Issue winter 2014, Vol. 4, pp. 47-57.
  38. KIBIM Magazine, Vol.5 First Issue spring 2015, Vol. 5, pp. 23-34.
  39. KIBIM Magazine, Vol. 5 Second Issue sumer 2015, Vol. 5, pp. 49-58.
  40. KIBIM Magazine, Vol. 6 First Issue spring 2016, Vol. 6, pp. 38-44.
  41. Kim, Y. S. (2010). New Paradigm of Project Delivery System for BIM Based Construction Projects ; Integrated Project Delivery (IPD) System, Journal of the Architecture Institute of Korea, 54(1), pp. 37-40.
  42. Kim, U. Y. (2017). CM at Risk Introduction Plan to Domestic Public Sector, Journal of the Architecture Institute of Korea, 61(5), pp. 34-38.
  43. Korean Institute of Building Information Modeling, http://www.kibim.or.kr/Board/board.asp?b_code=393&Action =content&GotoPage=1&B_CATE=BBS1 (2017. 03. 24).
  44. Kreider, R., Messner, J., Dubler, C. (2010). Determining the Frequency and Impact of applying BIM for Different Purposes on Projects, Proceedings 6th International Conference on Innovation in Architecture, Engineering and Construction (AEC), pp. 1-10.
  45. Lee, J. S., Ham, N. H., K, J. J. (2015). A Study about BIM Execution Plan for Specialty Contractors at Construction Phase ; focused on Specialty Contractors in Reinforced Concrete Works, Journal of KIBIM, 5(3), pp. 19-32. https://doi.org/10.13161/KIBIM.2015.5.3.019
  46. McCuen, T. L., Suermann, P. C., Krogulecki, M. J. (2011). Evaluating Award-winning BIM Projects Using the National Building Information Model Standard Capability Maturity Model, Journal of Management in Engineering, 28(2), pp. 224-230. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000062
  47. Messner J., 2009. "BIM Project Execution Planning" May, AGC BIM Forum Presentation, http://bimforum.org/wp-content/uploads/presentations/philly-october-2009/Messner_AGC_BIMForum_Presentation.pdf
  48. Ministry of Land, Infrastructure and Transport, http://www.molit.go.kr/USR/NEWS/m_71/dtl.jsp?id=95077914 (2016. 08. 23).
  49. Yoon, S. W., Kim, S. A., Choi, J. M., Keum, D. Y., Jo, C. W. (2015). A Proposal for Using BIM Model Created in Design to Construction Phase ; Case Study on preconstruction adopting BIM, Journal of KIBIM, 5(4), pp. 1-10. https://doi.org/10.13161/KIBIM.2015.5.4.001

Cited by

  1. BIM-Based Digital Fabrication Process for a Free-Form Building Project in South Korea vol.2019, pp.None, 2017, https://doi.org/10.1155/2019/4163625
  2. BIM을 이용한 건설프로젝트의 이점에 관한 사례 연구 - 국내 건축공사 사례를 중심으로 - vol.9, pp.4, 2017, https://doi.org/10.13161/kibim.2019.9.4.010