DOI QR코드

DOI QR Code

교육시설 내용년한 산정 연구 - 옥상방수와 바닥마감재를 대상으로 -

Establishment of the Service Life of the Education Fcilities - Focused on the Roof water-proof and Floor finishings -

  • 투고 : 2017.04.19
  • 심사 : 2017.08.15
  • 발행 : 2017.11.30

초록

Educational facilities have an affect to make a decently learning environment. After constructed, it needs a maintenance plan to keep the performance or function which provide the repair time, repair scope and ratio. But the fundamental data are so insufficient that the field worker can't provide the maintenance plan and has no choice use the other data which concerned with apartment or office building. Above all, the service life is indispensible to make a repair plan because the repair time and scope would be provided within the service life. This study aimed at providing the method to make a service life of component in educational facilities and applying the method into the roof proof and floor finishing. Results are shown that first, it is important to set the $1^{st}$ repair time after constructed. when it proposes the three ways with the probability approach, choice probability model and cumulative cost function. Second, the service life of roof proof is provided with about 35 years. In addition, the service life of the floor finishing is about 40 years. These result would be utilized to conduct the repair plan under the service life.

키워드

참고문헌

  1. BCIS(2006), Life Expectancy of Building Components- Surveyors' experiences of buildings in use.
  2. Economic committee of Archi. Institute of Japan(1995), Standard of Repair Approach, AIJ.
  3. Oh, S.J., Kim,S.S., Jun, J.Y, and others(1998), "A Study on the Running Cost model of the Office Buildings in Korea", Proceedings of AIK, Vol. 18, No1, pp.1153-1158
  4. Lee, K.H.(2001), " A Study on the Factor Analysis of Maintenance Cost of Domestic Apartment Housing" J. of AIK in Planning area, Vol. 17, No 9, pp.321-328.
  5. Lee, K.H.(2002), "A Study on the Space Size Analysis in aspect of Maintenance Cost in the Multifamily Housing-Focused on the Central Heating System using the Gas-,", J. of AIK in Planning area, Vol. 18, No 7, pp.51-58.
  6. Lee, K.H.(2006), "A Study on Forecasting the Repair Time Range of the Building Components in the Apartment Housing", J. of Korea Housing Association, Vol. 17, No. 2, pp.19-26.
  7. Lee, K., Jang, J. and Chae, C.(2005), "A Study on the Service life of the Building Components in the Apartment Housing", J. of Korea Housing Association, Vol. 16, No. 5, pp.67-74.
  8. Korea Institute of Construction Technology(1994), Optimal Maintenance Model of Building(II).
  9. Cho, C.H., Lee, W.R.(2008)), "A Survey Study on the Maintenance & Operations Costs of Elementary, Middle and High School Facilities ", J. of AIK in Planning area, Vol. 24, No. 4, pp.87-96.
  10. Cha, K.H., Choi, Y.J., Lee, M.H., Jung, Y.H, Park, T.G. (2009), "A Study on Methods to Estimate Maintenance Costs Applying Building Area Coefficients ", Proceedings of AIK in Structural area, Vol 29, No.1, pp.665-668.
  11. Architectural Institute of Japan(1988), Consideration on the Building Service Plan.
  12. Japanese Center of Development Technology(1986), Economic Assessment Method for Conservation and Improvement of Building, Kibodang.
  13. Japanese Housing Research Center(1988), Survey and Investigation on the Guideline for Repair Plan of Mansion.
  14. Japanese Construction Training Center(1984), " trend of the Durability Improvement Research. p.21.
  15. Woochiwoomi(1991), "A Study on the Long Term Repair Plan based on the LCC"-Example of the Office Building-", Proceedings of AIJ.
  16. Mansion Maintenance Center(2003), Scheduled Repair Plan.
  17. Mansion Maintenance Center(2003), Manual on the Repair Cost Cumulation.
  18. Architectural Institute of Japan(1988), Repair Standard of Building Service Life Plan.

피인용 문헌

  1. Establishment of the Preventive Maintenance Repair Time for the floor finishingsin the Education facilities vol.19, pp.1, 2019, https://doi.org/10.12813/kieae.2019.19.1.089