References
- Carbone, T. A., & Tippett, D. D. (2004). Project risk management using the project risk FMEA. Engineering Management Journal, 16(4), 28-35. https://doi.org/10.1049/em:20060406
- Chrysler Corporation, Ford Motor Company, General Motors Corporation (1995), "Potential failure mode and effects analysis", Reference Manual, 2nd ed.
- Coates, F.J. (2000): Scenario Planning, in: Technological Forecasting and Social Change 65, 115-123.
- Daszynska-Zygadlo, K. (2012). Scenario planning and real options analysis in integrated risk management process. Universitatis Mariae Curie-Sklodowska. Sectio H. Oeconomia, 46(4 (XLVI)), 75-84.
- Datta, S, and Mukerjee, S.K (2001) "Developing a Risk Management Matrix for Effective Project Planning-An Empirical Study," Project Management Journal, 32:2, pp. 45-57. https://doi.org/10.1177/875697280103200206
- Godet, M. (1987) Scenarios and Strategic Management, Butterworth, London.
- Iyer, K.C, Chaphalkar, N.B, Joshi, G.A (2007), "Understanding Time Delay Disputes in Construction Contracts," International Journal of Project Management 26, pp. 174-184.
- Kumaraswamy, M. (1997), "Conflicts, claims and disputes", Engineering, Construction and Architectural Management, Vol. 4 No. 2, pp. 95‐111.
- Kupers, R and Wilkinson, A (2013). Living in the Futures. Harvard Business Review. Available online [https://hbr.org/2013/05/living-in-the-futures].
- KPMG-PMI (2013). Study on project schedule and cost overruns. Available online [http://www.pmi.org.in/manageindia/volume5/issue03/report.abstract.html].
- Pritchard, Carl L. (2000). "Advanced Risk-How Big is Your Crystal Ball?" Proceedings Project Management Institute Annual Seminars & Symposium.
- Ratcliffe, J. (2000): Scenario building: a suitable method for strategic property planning?. Property Management, Vol. 18 Iss: 2, pp.127-144. https://doi.org/10.1108/02637470010328322
- Rose, K. H. (2013). A Guide to the Project Management Body of Knowledge (PMBOK(R) Guide)-Fifth Edition. Project Management Journal, 44(3), e1-e1. https://doi.org/10.1002/pmj.21345
- Sawhney, A , Agnihotri , R, Paul , VK (2014) "Grand challenges for the Indian construction industry", Built Environment Project and Asset Management, Vol. 4 Iss: 4, pp.317 - 334. https://doi.org/10.1108/BEPAM-10-2013-0055
- Sinha, M, Wayal, A.S (2008). "Dispute Causation in Construction Projects". IOSR Journal of Mechanical and Civil Engineering, (IOSR-JMCE) ISSN: 2278-1684, pp. 54-58.
- van der Heijden, K. (2002) 'Can internally generated futures accelerate organizational learning?', Paper for Conference on Probing the Future: Developing Organizational Foresight in the Knowledge Economy, Strathclyde University, UK.
- List of Dispute and Arbitration Cases from http://indiankanoon.org/[Accesed on 15th Dec 2014] 1. http://indiankanoon.org/doc/158014472/ 2. http://indiankanoon.org/doc/173600971/ 3. http://indiankanoon.org/doc/142262332/ 4. http://indiankanoon.org/doc/177830522/ 5. http://indiankanoon.org/doc/139938493/ 6. http://indiankanoon.org/doc/161758924/ 7. http://indiankanoon.org/doc/145890018/ 8. http://indiankanoon.org/doc/9741462/ 9. http://indiankanoon.org/doc/194276058/