DOI QR코드

DOI QR Code

An Analysis on the Job Efficiency of Field Managers in Remodeling Project and Its Improvement Measures

리모델링공사 현장관리자의 업무효율성 분석 및 향상방안

  • 김민재 (삼우CM건축사사무소 공공사업팀) ;
  • 손창백 (세명대학교 건축공학과)
  • Received : 2016.03.03
  • Accepted : 2016.04.04
  • Published : 2016.05.30

Abstract

As of 2015, remodeling market in Korea is estimated at 9 to 10 trillion KRW. Notwithstanding the deregulation, construction companies are very cautious of expansion remodeling business due to inefficiency resulting from unexpected incidents and various matters in the course of expansion remodeling construction. Hence, improvements in efficiency of field managers performing expansion remodeling construction are critical for vitalization of future remodeling market. Especially, capability of field managers in charge of remodeling construction greatly affects the efficiency and is a critical factor in success of remodeling construction. Hence, this research aims to present improvement plan by identifying key tasks of expansion remodeling at each construction step, and analyzing the level of field manager's job performance and degradation factors of job efficiency, in order to vitalize remodeling market through enhanced efficiency of domestic expansion remodeling.

Keywords

References

  1. Bang, J. S., Lee, D. B., & Kwan, S. H. (2006). Construction Technology of Aged-housing Remodeling "Royal mansion" in Ichon dong, Journal of the Korean Society of Steel Construction, 18(4), 88-102
  2. Ha, J. S. (2015). Seeking Remodeling Activation Measures, Journal of Korea Remodeling Association, 55, 31-33
  3. Kim, H. S. (2010). A Study on the Evaluation of the Risk Index and the Safety Management Guide for the Accident Prevention in Remodeling Construction, Korea Occupational Safety & Health Research Institute.
  4. Kim. Y. B. (2014). A Study on the Characteristic of National Assembly Members Office Building Remodeling during Inhabitation, Thesis, Yonsei University.
  5. Lee. K. W. (2014). Study of Status and Problems domestic Apartment Remodeling, Journal of the Korea Institute of Building Construction, 14(2), 20-24.
  6. Seo, H. W., Cha, W. C., Park, J. S., Kwan, W., Lee, J. S., & Jun, J. Y. (2007). Constitution of Work Process for Apartment Renovation Project in Construction Phase, Journal of the Architectural Institute of Korea, Structure & Construction Section, 27(1), 733-736
  7. Son, C. B. (2007). Analysis and Reduction Plan of Management Service Load in the Apartment Construction Sites, Journal of the Architectural Institute of Korea, Structure & Construction Section, 23(9), 239-246
  8. Park, K. H., & Son, C. B. (2010). Analyzing the Level and Influence Factors for Work Performance of Field Managers in General Construction Companies, Korean Journal of Construction Engineering and Management, 11(3), 115-124 https://doi.org/10.6106/KJCEM.2010.11.3.115
  9. Yoon. J. J. (2012). Development of Construct-ability Checklist for each Stage of Apartment Remodeling, Thesis, University of Seoul.