Abstract
The study of maintenance planning is important in military weapon systems because it can improve their availability and reduce the operational and maintenance cost during the total life cycle. In maintenance planning, it is important to determine the preventive maintenance task and its optimal interval. This paper focuses on the hard time task, which is one of the preventive maintenance tasks. A hard time task removes an item or restorative action before some specified maximum age limit to prevent functional failure. The Monte-Carlo simulation model was proposed to help understand the cost effectiveness of a hard time task. In the simulation, various shape parameters of the Weibull distribution and cost ratio of corrective maintenance to preventive maintenance were assumed. Using a Monte-Carlo simulation, a quantified cost saving effect and optimal preventive maintenance interval were suggested.
본 논문은 복잡해지는 군수분야에서 효율적이고 효과적인 예방정비업무 할당을 위해 Hard Time업무의 최적 주기산정 및 이를 통한 경제적 효용성을 분석하는데 연구 목적이 있다. 본 연구는 기존 연구에서 제시하는 예방정비 주기 선정방법의 한계점을 분석하였다. 또한 일반적인 Wearout 고장 특성을 설명하는 와이블 수명분포에서 다양한 형상모수 조건과 예방정비비용과 고장정비비용 조건을 가정한 시뮬레이션을 통해 가상의 시스템에 대한 정비활동을 모의하여 총 정비비용의 추의를 분석하였다.