DOI QR코드

DOI QR Code

Strategy for Various CM Applications based on Comparative Case Analysis

사례 비교분석을 통한 CM 적용 다양화 방안 - 발주자 특성 및 사업특성을 중심으로 -

  • Received : 2015.07.27
  • Accepted : 2015.12.30
  • Published : 2016.01.31

Abstract

Domestic CM market has continued to grow since the enactment of CM policies in 1996. In addition, future CM market is forecasted to have potential high growth. Therefore, it is necessary to apply various CM business models reflecting the owner's requirements and characteristics in order to improve in the CM industry and to strengthen the competitiveness in the overseas construction market. In this context, the purpose of this study is to suggest strategies of various CM applications based on comparison of 4 cases analyzed by 'business weight' and 'business depth' in terms of business function as well as by the types of 'CM market' and 'CM practice'. Result of this comparative analysis shows that each case presents differences in terms of type, business weight, and business depth of CM practice. However, domestic public CM services are currently being challenged to strengthen capability throughout the project life-cycle against the limitation of government's CM policies focused on the construction supervision. In order to address this problem, this study proposes the strategies of various CM applciations from several different perspectives

1996년 국내에 CM 제도가 도입된 이후 지금까지 많은 발전을 이루어 왔고, 그 수요와 계약 또한 꾸준히 증가하고 있다. 또한 향후 CM 시장은 미래 성장 가능성이 있다는 점에서 CM 산업이 지금보다 한 단계 발전하고 해외 경쟁력 향상을 위해서는 발주자의 요구사항과 프로젝트 특성을 반영한 다양한 CM 적용을 위해 산업 공동의 노력이 필요하다. 이에 본 연구는 4가지의 다양한 CM 적용 형태별 사례들을 '업무비중' 및 '업무심도'를 업무기능을 중심으로 분석하고, 사례별로 CM '시장유형' 및 '업무형태'별 유형을 정의하였다. 사례 비교 분석 결과, 각 사례별로 CM 시장 및 적용 업무 유형별 업무 비중과 심도는 다양하게 나타났고, 국내 공공 사례에서 국내 민간 사례, 그리고 해외 민간 사례로 갈수록 시공단계의 품질관리 중심에서 기획, 설계관리, 공정관리 등 사업초기 단계 업무들의 비중과 심도가 높아지면서 전 생애주기 단계에 걸쳐 교과서적인 CM 업무를 수행한 것으로 나타난다. 그러나 현재 대부분의 국내 공공 CM 사업은 시공단계의 감리 업무에 집중된 제도로 인해 CM 적용 다양화를 위한 전 생애주기관점에서 기술경쟁력 강화에 어려움을 겪고 있다는 문제점을 도출하였다. 이에 본 연구는 이러한 문제점을 해결하기 위해 제도, 산업, 그리고 기업차원에서 CM 적용 다양화 방안을 제시하였다.

Keywords

References

  1. Cho, H., and Kang, K. (2001). "Analysis on Architect's CM Capability for Development of Expended Service CM. - Focused on Design Expended CM Model in Private Sector -" Journal of the Architectural Institute of Korea, 17(10), pp. 153-160.
  2. Ha, J., and Jung, Y. (2014). "Evaluation of CM Capability based on Business Functions for International Plant Construction." Korean Journal of Construction Engineering and Management, KICEM, 15(6), pp. 3-15. https://doi.org/10.6106/KJCEM.2014.15.6.003
  3. Jung, Y. and Gibson, G. E. (1999). "Planning for Computer Integrated Construction." Journal of Computing in Civil Engineering, ASCE, 13(4), pp. 217-225. https://doi.org/10.1061/(ASCE)0887-3801(1999)13:4(217)
  4. Jung, Y., Woo, S., Kang, S., and Lee, B. (2002). "Effect s of CM Contracts on the Management Technology in the Korean Construction Industry." Journal of The Korean Society of Civil Engineers, 22(3), pp. 483-495.
  5. Jung, Y., Woo, S., Park, J., Kang, S., Lee, Y., and Lee, B. (2004). "Evaluation of the Owners' CM Functions." Korean Journal of Construction Engineering and Management, KICEM, 5(3), pp. 128-136.
  6. Jung, Y., Joo, M. and Kim, H. (2011). "Project Management Information Systems for Construction Managers: Current constituents and future extensions", Proceedings of the 28th International Symposium on Automation and Robotics in Construction (ISARC 2011), Seoul, Korea, pp. 597-602.
  7. Jung, Y., Shin, D., Kang, S., and Kim, N. (2014). "Growth Model for Korean CM Firms based on 2012 Statistics." Korean Journal of Construction Engineering and Management, KICEM, 15(6), pp. 92-104.
  8. Kang, S., Jung, Y., Kim, N., and Shin, D. (2014). "Policies and Tasks for Improving Korean CM Industry." Korean Journal of Construction Engineering and Management, KICEM, 15(5), pp. 71-81.
  9. Kim, S., Kim, J., Lee, Y., and Kim, J. (2007). "A Study on Method Activation of Construction Management through Investigation of Public Owners' Capability level." Proceedings of KICEM Annual Conference 2007, pp. 289-294.
  10. Lee, B., Kim, D., Woo, S., and Jung, Y. (2001). "Determination of CM Cost in Korean Domestic Public Construction Project." Journal of The Korean Society of Civil Engineers, 21(5), pp. 725-735.
  11. Park, H., Shin, K., Park, H., and Jung, Y. (2008). "A Study of the Future Strategy and Mission for the Stakeholders in Industry, Academy, and Government for the Revitalization of CM." Korean Journal of Construction Engineering and Management, KICEM, 9(6), pp. 244-256.

Cited by

  1. CM Prospects and Strategies Based on Contract Statistics : 1997 through 2014 vol.17, pp.5, 2016, https://doi.org/10.6106/KJCEM.2016.17.5.097