Abstract
This study is to confirm the effect of pre-installed pipe-roof by measuring earth pressure acting on the underpass. In recently developed trenchless methods pre-inserted steel pipes before ground excavation to form pipe-roof are connected each other with re-bars and filled with mortar. In this study, focusing on the Upgraded Pipe Roof Structure method (UPRS) and Front-Jacking, earth pressure around pipe-roof is measured after insertion of steel pipe to ensure the effect of earth pressure reduction. In case of the UPRS earth pressure is considerably reduced because of the reinforced effect of pipe-roof. In case of the Front-Jacking in which the whole underpass structure is pushed into the ground, earth pressure is not reduced as expected, because the pre-installed pipes are not needed to be reinforced.
본 연구의 목적은 비개착공으로 시공되고 있는 지하차도를 대상으로 지하차도 상부 및 측벽에 작용하는 토압을 계측하여 압입된 강관에 의한 지보효과 확인을 목적으로 하고 있다. 근래의 비개착공법은 파이프루프를 형성하기 위한 강관을 압입한 후 강관과 강관사이를 철근으로 보강하고 모르타르를 타설하는 방식으로 침하에 대한 안정성을 보다 확보하기 위한 노력을 기울이고 있다. 이에 최근 적용되고 있는 UPRS(Upgraded Pipe Roof Structure)공법과 프론트잭킹(Front-Jacking)을 중심으로 강관 압입 후 강관에 의한 토압감소효과를 확인하기 위하여 지하차도 주변의 토압을 계측하였다. 그 결과 UPRS공법의 경우 지하차도에 토압이 상당부분 감소하여 강관보강에 의한 지보강성 효과가 발휘되는 것으로 분석되었다. 프론트잭킹 공법의 경우 지하차도 구조물이 외부에서 제작되어 압입되는 형식으로 강관을 보강시킬 필요가 없기 때문에 강관보강에 의한 토압감소효과는 예측한대로 발휘되지 않는 것으로 분석되었다.