• Title/Summary/Keyword: 비개착공법

Search Result 27, Processing Time 0.027 seconds

Development of Trenchless Tunneling Method Using Pressurizing Support and Its Field Application (가압식 지보를 이용한 비개착 터널공법 개발 및 현장적용 사례)

  • Kim, Dae-Young;Lee, Hong-Sung;Sim, Bo-Kyoung
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.7
    • /
    • pp.17-30
    • /
    • 2012
  • A new trenchless tunneling method using pressurizing support has been developed. As it overcomes shortcomings of conventional methods, it is applied to the field. The main concept of the new method is the pressurization system which, by means of pressurization bag between outer flange of steel ribs and excavated perimeter, applies the pressure corresponding to the magnitude of the relaxed earth pressure caused by excavation to the ground to prevent ground displacement. The stability of the support members and effect of displacement control of the new method were verified through several ways such as numerical tests and various model tests. The new method was applied to the construction of a 10.7 m wide, 7.9 m high and 85 m long road tunnel that passes under Yeongdong Expressway. By applying the new method, the tunnel construction was successfully completed in 13.5 months. It decreases the construction period to 35% compared to that of conventional methods, and ground displacement was almost negligible.

Application of Non-Open Cut H.A.S Method to Improve Constructability (시공성 향상을 위한 비개착 H.A.S 공법 적용에 관한 연구)

  • Choi, Jung-Youl;Jang, Sung-Ho;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.6
    • /
    • pp.765-773
    • /
    • 2022
  • This study is a study on the application of a horizontal excavation machine system to improve constructability. In this study, the structural stability of non-covered temporary facilities was evaluated by comparing field measurements and numerical analysis. In addition, the appropriateness of the measurement results was analyzed by comparing and analyzing the results of numerical analysis with the analysis results applying the Gaussian probability density function to the measurement results. In this study, structural safety and long-term durability of the linkage were analyzed based on numerical analysis. As a result of the study, it was analyzed that the non-open cut method (H.A.S. method) of this study secures structural safety and constructability as the behavior in the actual construction process is more safe than the numerical analysis results, even if the uncertainty of the ground condition is taken into account.

A Study on the Finite Element Analysis and Management Criteria by Applying UPRS Method in the Subway Station (기존 지하철정거장 비개착공법 적용시 유한요소 해석과 관리기준에 관한 연구)

  • Cho, Byeong Joon
    • Journal of Korean Society of Disaster and Security
    • /
    • v.12 no.4
    • /
    • pp.43-52
    • /
    • 2019
  • To analyze the influence on the stability, resulting from application of upgrade pipe roof structure (UPRS) method to the structure existed under subway Station, physical properties of a ground, elasticity and elasto-plastic theories, including displacement analysis of finite elements, stress analysis of finite elements, displacement caused by steel pipe propulsion and internal excavation, and stress change in a steel pipe, were introduced. Then, the influence on structural stability when applying the UPRS method was compared and reviewed based on the construction management standard of the Ministry Land, Infrastructure and Transport and foreign sources, using numerical analysis with a model which assumes that each microelement divided into a structurally stable point consists of the connection of finite points. As a result of the finite element analysis, 7.21 mm maximum displacement, 1/3,950 angular displacement, 70.28 MPa bending compressive stress of steel pipe structure constructed with UPRS (non-excavation) method and 477.38 MPa maximum shear strength were within their allowable standards (25.00 mm, 1/500, 210.00 MPa and 120.00 MPa, respectively), and therefore, the results showed that the design and construction are stable.

A Study on Surface Settlement Prediction Method of Trenchless Technology Pipe Jacking Method (비개착 강관압입공법의 지표침하 예측방법 연구)

  • Chung, Jeeseung;Lee, Gyuyoung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.16 no.11
    • /
    • pp.29-37
    • /
    • 2015
  • Non-excavation method is needed to secure the stability of existing structures during construction. Therefore, prediction of ground settlement is essential. Causes of settlement when using steel pipe indentation method are leading pipe-steel pipe gap, excessive excavation and soil-steel pipe friction etc. Also they are similar to the causes of settlement when using Shield TBM during construction. In this study, ground settlement during steel pipe indentation is predicted by the Gap Parameter Method and Volume Loss Method which are kinds of Shield TBM prediction Method. and compared with those of prediction methods by conducting field test. As a result, Volume Loss Prediction Method is the most similar to the field tests. However, It is needed to additional studies, such as decision of the factors and adaptability for total settlement predictions of non-excavation method.

A preliminary study on the use of analytic hierarchy process for selecting a optimum trenchless excavation method (최적의 비개착공법 선정을 위한 계층분석법의 적용에 관한 기초연구)

  • Kang, Tae-Ho;Chang, Soo-Ho;Choi, Soon-Wook;Lee, Chulho;Cho, Jinwoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.6
    • /
    • pp.685-693
    • /
    • 2015
  • There have been high demands for urban underground structures. However, they should be rapidly constructed while maintaining the functions of adjacent structures and road systems especially in urban areas. In this respect, trenchless excavation methods are considered to very effective in minimizing ground displacements during excavation works. A variety of field conditions such as economic, technical and environmental aspects should be taken into consideration when an optimum trechless excavation method is to be chosen in a given condition. Therefore, this study aims to carry out a fundamental study to select an optimum trenchless excavation method by the decision making technique. Especially, AHP (Analytic Hierarchy Process) which is a kind of a multiple attribute decision making process is adopted to consider the opinions of experts and to derive reliable decision criteria. As a result, the weights of key factors and the most effective trenchless methods for different ground conditions were proposed in this study.

Development of Long-Distance Subsea Cable Uninterrupted Laying Method and Equipment for the Construction of Power System In Island (도서지역 전력계통 구성을 위한 장거리 해저케이블 비개착 포설 공법 및 장비개발)

  • Lee, Jaedeuk;Park, Changyong
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.2
    • /
    • pp.227-231
    • /
    • 2021
  • 해저케이블 설치시 고비용, 민원발생, 환경오염 논란 등의 이슈가 많은 개착식 공법을 대신하여 현장에서 점차 친환경적 공법으로 자리 잡고 있는 비개착식 공법을 이용한 전력설비 건설이 활발하게 논의되고 있다. 본 논문에서는 이런 새로운 시도를 위해 필수적인 장거리 케이블 포설에 대한 새로운 방법을 현장실증을 통한 Data 확보 및 장비개발로 새롭게 제시하였다. 케이블 포설시 밀어주는 장비인 Pusher, 기존의 윈치와 Pusher 의 속도를 동기화시키는 장치 및 케이블을 꼬임없이 당기기 위한 다도체용회전형풀링아이 등을 개발하여 기존에 설치하였던 해저용특수케이블이 아닌 현재 일반적으로 사용중인 케이블의 포설가능 거리를 증가시켜 도서지역 전력공급 등을 위한 장거리케이블 포설에 비개착식 방식이 적용 가능 토록 새로운 케이블 포설공법을 개발하였다.

A numerical study on the three-dimensional ground movement by the trenchless construction method of concrete box by a square steel pipe supporting system (사각형 강관을 이용한 비개착 시공에 따른 지반거동의 분석: 수치해석)

  • Choi, Soon-Wook;Park, Young-Taek;Chang, Soo-Ho;Bae, Gyu-Jin;Lee, Ki Taek;Baek, Yong Ki
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.5
    • /
    • pp.469-484
    • /
    • 2012
  • This study aims to numerically investigate ground movement around a square steel pipe as well as a group of square steel pipes induced by its and their ground penetration for trenchless construction of a concrete box. From numerical results, ground movement induced by a square steel pipe is much more dominantly governed by vertical displacement rather than horizontal displacement. Ground settlement induced by pipe penetration is much larger as the overburden becomes lower. The settlement is also shown to be slightly dependent upon the sequence of pipe penetration. More careful construction management is highly in demand during the penetration of upper pipes since their induced settlement occupies approximately 75 percent of total ground settlement after the whole construction of steel pipes.