DOI QR코드

DOI QR Code

The Study on Activity Star Problem and Optimum Construction Method Through the Defect Case of Zero Energy House in the Existing Building

기축건물의 제로에너지 하우스 하자 사례를 통한 공종별 문제점 및 최적구축 방안에 관한 연구

  • 김선근 ((주)대우건설 주택사업본부) ;
  • 권순욱 (성균관대학교 공과대학 건축토목공학부)
  • Received : 2015.01.05
  • Accepted : 2015.03.24
  • Published : 2015.04.01

Abstract

In this paper existing buildings, not a new buildings and house for living people not just a displaying and a viewing, created by the imagine effect or virtual simulation was applied various Active and Passive elements. After constructing zero-energy houses, through default case happened during operation period it is described problems and solutions about field part, work classification, installation by Location part, and Installation equipment part. Since then, to take advantage of this thesis, it's the purpose of this paper using as the baseline data for building a zero-energy house in another similar case.

Keywords

References

  1. Ministry of Trade Industry and Energy 'Energy Master Plan 2' (2014).
  2. J. H. Yoon, Design Checklist for Sief-sufficient Zero Energy Solar House(ZESH) (2005).
  3. Ministry of Transportation Notice No. 2014-520 Issue (2014).
  4. Korea Mech. Const. Contractors Association, LH 'The Green' Green Technologies Applied to the Tube (2011).
  5. S. H. Shin, 'Korean Zero Energy House 'Green Tomorrow' Success Stories', 2009.
  6. S. H. Park, 'Design and construction and evaluation of 3 L House' (2006).
  7. J. U. Sue, '[ZENER HEIM] Guidebook' (2010).
  8. J. U. Sue, '[GREEN PREMIUM] Tech Source Book' (2010).