Browse > Article
http://dx.doi.org/10.4313/JKEM.2015.28.4.262

The Study on Activity Star Problem and Optimum Construction Method Through the Defect Case of Zero Energy House in the Existing Building  

Kim, Sun-Geun (DAEWOO E&C M&E Engineering Team)
Kwon, Soon-Wook (School of Civil & Architecture Engineering Sungkyunkwan University)
Publication Information
Journal of the Korean Institute of Electrical and Electronic Material Engineers / v.28, no.4, 2015 , pp. 262-270 More about this Journal
Abstract
In this paper existing buildings, not a new buildings and house for living people not just a displaying and a viewing, created by the imagine effect or virtual simulation was applied various Active and Passive elements. After constructing zero-energy houses, through default case happened during operation period it is described problems and solutions about field part, work classification, installation by Location part, and Installation equipment part. Since then, to take advantage of this thesis, it's the purpose of this paper using as the baseline data for building a zero-energy house in another similar case.
Keywords
Fossil energy; Zero energy house; New renewable energy active factor; Photovoltaic system; Solar hot water heating system; Heat pump cooling & heating system; fuel cell system;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Ministry of Trade Industry and Energy 'Energy Master Plan 2' (2014).
2 J. H. Yoon, Design Checklist for Sief-sufficient Zero Energy Solar House(ZESH) (2005).
3 Ministry of Transportation Notice No. 2014-520 Issue (2014).
4 Korea Mech. Const. Contractors Association, LH 'The Green' Green Technologies Applied to the Tube (2011).
5 S. H. Shin, 'Korean Zero Energy House 'Green Tomorrow' Success Stories', 2009.
6 S. H. Park, 'Design and construction and evaluation of 3 L House' (2006).
7 J. U. Sue, '[ZENER HEIM] Guidebook' (2010).
8 J. U. Sue, '[GREEN PREMIUM] Tech Source Book' (2010).