DOI QR코드

DOI QR Code

The Design Flowchart of Earthing System for Building Electrical Installations in Accordance with International Standards

국제표준에 따른 건축전기설비의 접지시스템 설계순서

  • Received : 2014.06.09
  • Accepted : 2014.07.01
  • Published : 2014.08.31

Abstract

In this paper, designing of an earthing system in accordance with international standards with regard to 22.9kV-y multi-grounded neutral system is discussed and confirmed that the consumer's earthing system can be a part of a global earthing system by interconnecting its earthing system with the neutral conductor of 22.9kV-y multi-grounded system. Further, it is proposed that some modification of the earthing system design flowchart given in the international standards are necessary when considering the equipotential bonding, lightning protection, and telecommunications facilities as well as the basic safety requirements.

Keywords

References

  1. Bok-Hee Lee, Seung-Chil Lee, The Major Foundational Technics for Grounding System, Uijae, 2000.
  2. IEC 619396-1, Power installations exceeding 1kV a.c.-Part 1: Common rules, Ed 2.1, 2014.
  3. CENELEC HD 637 S1, Power installations exceeding 1kV a.c., 1999.
  4. EN 50522, Earthing of power installations exceeding 1kV a.c., 2010.
  5. KS C IEC 60364-4-44, Low Voltage Electrical installations - Part 4: Protection for safety - Chapter 44: Protection against voltages disturbances and electromagnetic disturbances, KATS, 2013.
  6. M. Desmedt, J. Hoeffelman, D. Halkin, Use of a global earthing system to implement the safety requirement for protection against indirect contacts in HV systems, CIRED, 2001.
  7. Lothar FICKERT, Ernst SCHMAUTZER, Christian RAUNIG, Martin J. LINDINGER, Verification of global earthing systems, CIRED, 2013.
  8. J. R. Dunki-Jacobs, Conrad St. Pierre, The Function and Composition of the Global Industrial Grounding System, IEEE, 2006.
  9. IEEE Std 142-2007, IEEE Recommended Practice for Grounding of Industrial and Commercial Power Systems.
  10. KESCO, Criteria for inspection of private use electrical installations, 2011.
  11. KEA, Consumer's Electrical Installation Guide, 2013.
  12. Yong-Hun Lim, Duck-Hwa Hyun, Jong-Gi Choi, An analysis of The ground fault current Distribution of 22.9kV-Y Lines, KIEE, 2004.
  13. Sun-Kyu Choi, Jong-Kee Choi, Kyoung-Hun Kim, Myeong-Ho Choi, Byung-Sung Lee, Transferred OverVoltages on LV sides in Multigrounded Neutral during Line to Ground fault on Distribution Systems, KIEE, 2012.
  14. KEA, "A Study on Earthing Systems for Personal Safety and Protection of Equipment in LV installations" final report, 2007.

Cited by

  1. Designing flow chart for aircraft type training in aviation training process management pp.0002-2667, 2018, https://doi.org/10.1108/AEAT-03-2017-0096