The Design Flowchart of Earthing System for Building Electrical Installations in Accordance with International Standards |
Lee, Ju-Cheol
(Dept. of KEPIC, Korea Electric Association)
Yeom, Jin-Geun (Dept. of KEPIC, Korea Electric Association) Jeong, Seung-Hyun (Dept. of KEPIC, Korea Electric Association) Byeon, Cheol-Gyun (Dept. of KEPIC, Korea Electric Association) Kim, Jae-Chul (Dept. of Electrical Eng., Soongsil Univ.) |
1 | Bok-Hee Lee, Seung-Chil Lee, The Major Foundational Technics for Grounding System, Uijae, 2000. |
2 | IEC 619396-1, Power installations exceeding 1kV a.c.-Part 1: Common rules, Ed 2.1, 2014. |
3 | CENELEC HD 637 S1, Power installations exceeding 1kV a.c., 1999. |
4 | EN 50522, Earthing of power installations exceeding 1kV a.c., 2010. |
5 | KS C IEC 60364-4-44, Low Voltage Electrical installations - Part 4: Protection for safety - Chapter 44: Protection against voltages disturbances and electromagnetic disturbances, KATS, 2013. |
6 | M. Desmedt, J. Hoeffelman, D. Halkin, Use of a global earthing system to implement the safety requirement for protection against indirect contacts in HV systems, CIRED, 2001. |
7 | Lothar FICKERT, Ernst SCHMAUTZER, Christian RAUNIG, Martin J. LINDINGER, Verification of global earthing systems, CIRED, 2013. |
8 | J. R. Dunki-Jacobs, Conrad St. Pierre, The Function and Composition of the Global Industrial Grounding System, IEEE, 2006. |
9 | IEEE Std 142-2007, IEEE Recommended Practice for Grounding of Industrial and Commercial Power Systems. |
10 | KESCO, Criteria for inspection of private use electrical installations, 2011. |
11 | KEA, Consumer's Electrical Installation Guide, 2013. |
12 | Yong-Hun Lim, Duck-Hwa Hyun, Jong-Gi Choi, An analysis of The ground fault current Distribution of 22.9kV-Y Lines, KIEE, 2004. |
13 | Sun-Kyu Choi, Jong-Kee Choi, Kyoung-Hun Kim, Myeong-Ho Choi, Byung-Sung Lee, Transferred OverVoltages on LV sides in Multigrounded Neutral during Line to Ground fault on Distribution Systems, KIEE, 2012. |
14 | KEA, "A Study on Earthing Systems for Personal Safety and Protection of Equipment in LV installations" final report, 2007. |