References
- Hyeon-Seung Kim, (2011), "The Assessment of Preliminary Utilization for applying IT Tools in Construction Project by BSC System", master's thesis, Gyeongsang National University.
- Man-Kyun Kim, (2010), "A Study on Indicator of the strategic performance measures on Small Business", Journal of the Korean Institute of Plant Engineering, Vol. 15, No. 3, pp. 137-145.
- Robert S. Kaplan David P. Norton, (2004), "Strategy Maps", Book 21.
- Young-Je Hwang, Hyuck-Moo Kwan, (2009), "A TOC and BSC based Incentive Model for Small Companies and Some Case Analyses", The Korean Society for Quality Management, Vol. 37, No. 2, pp. 22-31.
- Yung-Sang Lee, Tae-Young Song, Hyo-Joon Hahm, (2005), "A study on the TPM Performance Index by Application og KPI", Journal of the Korean Institute of Plant Engineering Vol10. No 3, pp. 101-108, SEP.
- Bong-Yun Kim, (2008), "Design of An Effective Equipment Maintenance System Based on Maintenance Levels", PhD dissertation, Ajou University.
- KwangMan Kim, (2012), "Development of Performance Evaluation System for Plant Management Appling BSC Concept", Journal of the Korea society of computer and information, v.17 no.2, pp.231-239 https://doi.org/10.9708/jksci.2012.17.2.231
- Giyeong Do, (2005), "Dashboards for COPQ Control", Master's thesis, AJOU University
- Hyunjei Jo, Chul Kim, Yongju Cho, (2014), " Development of Mobile Dashboard System for Manufacturing Data Visualization", J. Korean Soc. Precis. Eng., Vol. 31, No. 4, pp. 311-317. https://doi.org/10.7736/KSPE.2014.31.4.311
- Jung-Eok Gu, (2011), "A Study on the Utilization of Business Intelligence and Dashboard in Academic Libraries", Journal of Korean Society for Information Management, Vol. 28, No. 1, pp. 263-283. https://doi.org/10.3743/KOSIM.2011.28.1.263
- Oh-Woon Kwon, Hong-Chul Lee, (2003), "A Study on the Improvement Countermeasures for the Equipment Productivity and Efficiency Based on the Equipment Loss Structures", Journal of the Korean Institute of Plant Engineering Vol 8. No 3, pp. 5-23, SEP.
- Hee Joong Cho, (2007), "A Study on the methodology for TPM Development and Performance Measurement", pp.31-42, master's thesis, Korea University.
- Daryl Mather, (2005), "The Maintenance Scorecard" Industrial Press Inc., pp. 32.
- Micro Strategy inc., "Dynamic Dashboards", http://www.microstrategy.com
- Wayne Eckerson, (2011), "Performance Dashboards Measuring, Monitoring, and Managing Your Business", InterworkSolutions Inc., pp.32-57.
- Ninetec, http://cmms.co.kr/k_cmms/enterprise.jsp