Browse > Article
http://dx.doi.org/10.12812/ksms.2014.16.4.417

Performance Assesment based Dashboards for Maintenance Management System  

Kim, Kwang Man (Department of Technology & Systems Management, Induk University)
Publication Information
Journal of the Korea Safety Management & Science / v.16, no.4, 2014 , pp. 417-426 More about this Journal
Abstract
Plant management have a greatest influence on the corporate variety of tasks such as production, quality, environment. So, various performance indices for plant management are operating. But plant management tasks can be carried out effectively, so that all of how to organize and efficiently manage indicators is lacking real condition In this paper, improved profitability, cost savings by applying the concept for the performance assessment, plant management services, such as the key indices for performance according to the objectives of the firm. Dashboard for plant management work using me to develop a system that manage.
Keywords
CMMS; Balanced Scorecard; Dashboard; Plant Management; Performance Assessment;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Hyeon-Seung Kim, (2011), "The Assessment of Preliminary Utilization for applying IT Tools in Construction Project by BSC System", master's thesis, Gyeongsang National University.
2 Man-Kyun Kim, (2010), "A Study on Indicator of the strategic performance measures on Small Business", Journal of the Korean Institute of Plant Engineering, Vol. 15, No. 3, pp. 137-145.
3 Robert S. Kaplan David P. Norton, (2004), "Strategy Maps", Book 21.
4 Young-Je Hwang, Hyuck-Moo Kwan, (2009), "A TOC and BSC based Incentive Model for Small Companies and Some Case Analyses", The Korean Society for Quality Management, Vol. 37, No. 2, pp. 22-31.   과학기술학회마을
5 Yung-Sang Lee, Tae-Young Song, Hyo-Joon Hahm, (2005), "A study on the TPM Performance Index by Application og KPI", Journal of the Korean Institute of Plant Engineering Vol10. No 3, pp. 101-108, SEP.
6 Bong-Yun Kim, (2008), "Design of An Effective Equipment Maintenance System Based on Maintenance Levels", PhD dissertation, Ajou University.
7 KwangMan Kim, (2012), "Development of Performance Evaluation System for Plant Management Appling BSC Concept", Journal of the Korea society of computer and information, v.17 no.2, pp.231-239   과학기술학회마을   DOI
8 Giyeong Do, (2005), "Dashboards for COPQ Control", Master's thesis, AJOU University
9 Hyunjei Jo, Chul Kim, Yongju Cho, (2014), " Development of Mobile Dashboard System for Manufacturing Data Visualization", J. Korean Soc. Precis. Eng., Vol. 31, No. 4, pp. 311-317.   과학기술학회마을   DOI
10 Jung-Eok Gu, (2011), "A Study on the Utilization of Business Intelligence and Dashboard in Academic Libraries", Journal of Korean Society for Information Management, Vol. 28, No. 1, pp. 263-283.   과학기술학회마을   DOI
11 Oh-Woon Kwon, Hong-Chul Lee, (2003), "A Study on the Improvement Countermeasures for the Equipment Productivity and Efficiency Based on the Equipment Loss Structures", Journal of the Korean Institute of Plant Engineering Vol 8. No 3, pp. 5-23, SEP.
12 Hee Joong Cho, (2007), "A Study on the methodology for TPM Development and Performance Measurement", pp.31-42, master's thesis, Korea University.
13 Daryl Mather, (2005), "The Maintenance Scorecard" Industrial Press Inc., pp. 32.
14 Micro Strategy inc., "Dynamic Dashboards", http://www.microstrategy.com
15 Wayne Eckerson, (2011), "Performance Dashboards Measuring, Monitoring, and Managing Your Business", InterworkSolutions Inc., pp.32-57.
16 Ninetec, http://cmms.co.kr/k_cmms/enterprise.jsp