Business impact analysis for disaster management of large underground limestone mine

석회석광산 지하대형공간의 재난관리를 위한 업무영향력 분석

  • Lee, Seong-Min (Youngdong University, Dept. of Civil & Environment Engineering) ;
  • Kim, Sun-Myung (Hanbuk University, Dept. of Energy & resources) ;
  • Lee, Yeon-Hee (Youngdong University, Industry-Academy collaboration foundation)
  • 이성민 (영동대학교 토목환경공학과) ;
  • 김선명 (한북대학교 에너지자원학과) ;
  • 이연희 (영동대학교 산학협력단)
  • Received : 2013.11.05
  • Accepted : 2013.11.18
  • Published : 2013.11.30

Abstract

As Limestone mines have been operated with various environmental, societal and managemental problems depending on their characteristics and developing methods, many great efforts have been applied to solve these problems. Installing the mining facilities underground is one of the successful efforts to keep the sustainable limestone mine development. This effort could reduce these problems. However, unfortunately it made an side effect of constructing a large underground space in mining site. Moreover, this space caused a necessity of various disaster managements for the safety of workers and facilities. This study introduces the priority list of a limestone mining process if there are disasters in underground mining site. This result is coming from the risk assessment and business impact analysis on survey data which were obtained from the miners of that particular limestone mine. According to the result, the highest risk is 'disregard of safety guidelines in crushing & classifier process'. The result also shows the highest priority business, above all things, is 'a pit linked work of in & out process'.

현재 국내 석회석광산은 개발 방식 및 특성에 따라 환경적, 사회적, 경영적 측면에서 다양한 문제 등을 내포한 채 운영되고 있다. 따라서 최근에는 이 같은 문제점들을 저감하고 지속가능한 광산개발을 위하여, 갱내채광 혹은 시설물 갱내화 등 다양한 노력이 계속되고 있다. 이러한 노력은 기존의 광산개발 공간 외에 새로운 지하대형공간의 생성을 유발하기 때문에, 작업자 및 시설물의 안전성확보를 위하여 발생 가능한 다양한 종류의 리스크에 대한 재난관리 필요성이 제기되고 있다. 본 연구에서는 지하대형공간을 구축하고 시설물을 갱내화하여 본격가동을 앞둔 석회석광업현장의 작업자들을 대상으로 설문조사를 실시하여 리스크 위험도평가 및 업무영향력분석 후 재난관리를 위한 업무우선순위를 도출하였다. 그 결과, 대상 현장의 경우 파분쇄 및 분립선별공정에서 안전수칙 불이행으로 인한 리스크에 대하여 위험도가 가장 높은 것으로 나타났다. 또한, 이 리스크에 대한 재난발생시 업무연속성 유지를 위한 영향력을 분석결과 우선적으로 갱내외의 연계작업이 원활하게 이루어지도록 해야 하는 것으로 나타났다.

Keywords

References

  1. Korean agency for technology and standards (2002), KS A ISO/IEC Guide 73, pp. 1-6.
  2. Disaster focus, (2010), "Japan, shikoku construction BCP certification", Internet homepage (http://www.di-focus.com)
  3. Hyun, K.C., Min, S.Y., Moon, J.B., Jeong, G.H., Lee, I.M. (2012), "Risk management applicable to shield TBM tunnel", Journal of Korean Tunnelling Association, Vol. 14, No. 6, pp. 667-697. https://doi.org/10.9711/KTAJ.2012.14.6.667
  4. Korea Business Continuity Planning Association Inc (2011), Tectbook for advanced course of disaster management, pp. 181-214.
  5. Lee, S.M., Kim, S.M., Lee, Y.H. (2012), "Introduction of the M (i,j,k) BCP and risk assessment of underground limestone mine", Tunnel and underground space, Vol. 22, No. 6, pp. 383-392. https://doi.org/10.7474/TUS.2012.22.6.383
  6. Ministry of Government legislation (2013), Internet homepage (http://www.law.go.kr)
  7. Ministry of trade,industry & energy (2013), Internet homepage (http://www.motie.go.kr)
  8. Paul Hopkin (2012), Fundamental of risk management, Koganpage, pp. 187-197.
  9. Saaty, T.L. (1980), The analytic hierarchy process, McGraw-Hill, New York.
  10. Yonhapnews article (2013), "The death toll from china's mine accident reached 800 in this year", Internet homepage (http://www.yonhapnews.co.kr)
  11. Yoon, Y.K., Seo, S.M., Choi, B.H. (2013), "Risk assessment with the development of CAES underground storage cavern", Tunnel and underground space, Vol. 23, No. 4, pp. 319-325. https://doi.org/10.7474/TUS.2013.23.4.319
  12. You, K.H. (2010), "A case study on the optimal tunnel design based on risk analysis", Journal of Korean Tunnelling Association, Vol. 12, No. 5, pp. 379-387.